Contractor · General building
Robert Bedford
37 building permits since 2017 in East Providence city, RI; Attleboro city, MA and Providence city, RI, across 5 counties — $1,085,551 in reported job value over 31 permits that state one.
- Building permits
- 37
- Reported job value
- $1.1M
- Active
- 2017–2026
- Latest permit
- Oct 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- East Providence city, RI11
- Attleboro city, MA5
- Providence city, RI5
- Barrington town, RI4
- Warwick city, RI2
- Cranston city, RI2
- North Attleborough Town city, MA1
- Bristol town, RI1
- West Warwick town, RI1
- Cumberland town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 3 |
| 2018 | 3 |
| 2019 | 4 |
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 6 |
| 2023 | 2 |
| 2024 | 3 |
| 2025 | 4 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms13
- Windows & doors13
- Remodels10
- Kitchens8
- New construction2
- Plumbing1
- Demolition1
Permit types
As the building departments classify them.
- Building Permit30
- RESI.5
- 1) Building Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 20, 2026 | Building Permit | 1st floor: All new replacement windows removing 1. All new finishes (Ceiling, Walls & Flooring). Install new kitchen. 2nd floor: New Bathroom. Fixtures in same | East Providence City | $125,000 |
| Sep 15, 2026 | Building Permit | Interior alterations (non-structural) to include: remodel the 2nd-floor bathroom. All fixtures to remain in existing locations. All new finishes. | Providence City | $37,200 |
| Apr 28, 2026 | Building Permit | Vinyl siding on dormers. | East Providence City | $16,930 |
| Dec 16, 2025 | RESI. | — | Attleboro City | — |
| Nov 4, 2025 | Building Permit | Remodel Bathroom #3 (first floor). All Fixtures to remain in Existing locations. | East Providence City | $28,565 |
| Jul 21, 2025 | Building Permit | Full gut of 1st & 2nd floor common bathrooms. All fixture to remain in same locations. | East Providence City | $53,000 |
| Jul 21, 2025 | Building Permit | Remove and replace 3 basement hopper windows in existing openings. Add exterior window wells. | Warwick City | $2,340 |
| Sep 5, 2024 | Building Permit | Remodel 1st floor kitchen within existing footprint. Remodel 2nd floor bathroom within existing footprint. Install 36 replacement windows to PHDC requirements. | Providence City | $300,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed21
- Active9
- Finaled4
- Stop work ordered2
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.