Contractor · Specialty (solar, fire, telecom)

Paula Rodriguez

37 building permits since 2024 in Peoria city, AZ and Mesa city, AZ — $349,401 in reported job value over 10 permits that state one.

Building permits
37
Reported job value
$349.4K
Active
2024–2026
Latest permit
Aug 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Peoria city, AZ27
  • Mesa city, AZ10

Permits by year

By issue date (application date where there is none).

036
6
202420252026*
* 2026 is year to date.
View as table
YearPermits
20242
20256
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar30
  • Battery storage10
  • Electrical10
  • Electric meters7
  • EV chargers2

Permit types

As the building departments classify them.

  • Residential27
  • Electrical10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 13, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURMesa$64,000
Apr 27, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$20,367
Oct 30, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$36,200
Oct 28, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMMesa$32,496
Oct 28, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$34,037
Oct 24, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$58,410
Oct 24, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$41,141
Jan 28, 2025ElectricalTHIS PERMIT IS ONLY FOR THE INSTALLATION OF TWO (2) ANKER SOLIX BATTERIES. ALL WORK TO BE PERFORMED PER IRC 2018 AND SERVICING UTILITY COMPANY SPECIFICATIONS. EMesa$22,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • C/o issued10
  • Expired3
  • Issued2
  • Not stated1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.