Contractor · Electrical

Newport Electric

37 building permits since 2011 in Woonsocket city, RI; Westford town, MA and Bridgewater Town city, MA, across 9 counties — $532,646 in reported job value over 22 permits that state one.

Building permits
37
Reported job value
$532.6K
Active
2011–2026
Latest permit
Apr 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Woonsocket city, RI5
  • Westford town, MA4
  • Bridgewater Town city, MA4
  • Newport city, RI4
  • North Kingstown town, RI4
  • Framingham city, MA2
  • Cohasset town, MA2
  • Quincy city, MA2
  • Stoughton town, MA2
  • Brooklyn town, CT1

Permits by year

By issue date (application date where there is none).

048
8
201520182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20113
20152
20161
20181
20197
20205
20213
20222
20231
20241
20253
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical28
  • Solar11
  • Battery storage7
  • Electric meters3
  • Remodels2
  • HVAC1
  • Roofing1
  • Plumbing1
  • Demolition1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical Permit20
  • ELECT.7
  • RESI.3
  • Res Solar2
  • BUILD1
  • Commercial Permit1
  • Electrical1
  • Residential Building1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 22, 2026ElectricalInstall new 100A service on garage. Install new 100A meter socket and 100A main breaker panel. Install whole house surge protection. Install new grounding systeBrooklyn Town$3,700
Mar 11, 2026ELECT.install customer supplied 48a charger located outside on a 4x6 post 24 feet from the house closer to driveway with emergency disconnect. A 60a overcurrent breakAvon Town$1,400
Feb 26, 2026BUILDInstall rooftop, rack-mounted, grid-connected Solar PV system consisting of (26) REC 460w panels with Enphase micro-inverters. No energy storage.Stoughton Town$40,305
Feb 26, 2026ELECT.Install rooftop, rack-mounted, grid-connected Solar PV system consisting of (26) REC 460w panels with Enphase micro-inverters. No energy storage.Stoughton Town$26,000
Jan 16, 2026RESI.Install rooftop, rack-mounted, grid-connected Solar PV system consisting of (15) solar modules with Enphase micro-inverters. No structural modifications requireBridgewater Town City$18,451
Jan 16, 2026RESI.Install rooftop, rack-mounted, grid-connected Solar PV system consisting of (25) modules with Enphase micro-inverters. No structural modifications required. No Bridgewater Town City$30,751
Jan 15, 2026ELECT.Install rooftop, rack-mounted, grid-connected Solar PV system consisting of (25) solar modules with Enphase micro-inverters. No energy storage.Bridgewater Town City$30,750
Jan 15, 2026ELECT.Install rooftop, rack-mouted, grid-connected Solar PV system consisting of (15) solar modules with Enphase micro-inverters. No energy storage.Bridgewater Town City$15,000

Permit status

Where its permits stand, as the departments report them.

  • Completed18
  • Issued7
  • Active5
  • Closed3
  • Not stated2
  • Finaled1
  • Documents submitted1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • NEWPORT ELECTRIC CONSTRUCTION
  • NEWPORT ELECTRIC CONSTRUCTION CORP

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.