Contractor · HVAC
PINOS AIR CONDITIONING & HEATING LLC
421 building permits since 2014 in Charlotte County, FL; North Port city, FL and Punta Gorda city, FL, across 4 counties — $2,822,068 in reported job value over 418 permits that state one.
- Building permits
- 421
- Reported job value
- $2.8M
- Active
- 2014–2026
- Latest permit
- Sep 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Charlotte County, FL340
- North Port city, FL50
- Punta Gorda city, FL26
- DeSoto County, FL3
- Palm Coast city, FL1
- Sarasota city, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 12 |
| 2015 | 27 |
| 2016 | 16 |
| 2017 | 7 |
| 2018 | 5 |
| 2019 | 6 |
| 2020 | 2 |
| 2021 | 66 |
| 2022 | 104 |
| 2023 | 72 |
| 2024 | 79 |
| 2025 | 12 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC395
- Heat pumps7
- Electrical1
- Windows & doors1
Permit types
As the building departments classify them.
- Residential Mechanical334
- Residential HVAC50
- AIR/CONDITIONING26
- Commercial Mechanical6
- Mechanical (Residential) - HVAC Changeout2
- MECHANICAL1
- Mechanical (Commercial) - HVAC Changeout1
- Over the Counter Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 11, 2026 | Residential HVAC | Installation of a Champion 2-ton, 14.3 SEER2 split heat pump system with cooling and heating capabilities, including a 5 kW heater assembly | North Port City | $8,865 |
| Sep 3, 2026 | Residential HVAC | • Install ADP 3.5-Ton 13.4 SEER2 Split AC Straight Cool & Heating System New 10KW Heater Assembly | North Port City | $11,980 |
| Aug 31, 2026 | Residential HVAC | Installation of a Champion 3 TON straight cool 14.3 seer 8 KW heater assembly | North Port City | $8,900 |
| Aug 17, 2026 | Residential HVAC | Install Champion 2.5-Ton Vertical System • 5KW Heater Assembly WITH Breaker | North Port City | $9,250 |
| Jun 11, 2026 | Residential HVAC | Replace all ductwork in home, remove and add all new runs confirm count for 3 bedroom home. 16 runs with new supply and return runs. | North Port City | $8,978 |
| May 29, 2026 | AIR/CONDITIONING | — | Punta Gorda City | $7,800 |
| Apr 27, 2026 | Over the Counter Permit | System #1 - Lower unit ( Hangar in Garage ): Installation of Trane 3-ton XV , 20.4 SEER2 split system AC heat pump with 5KW heater assembly System #2 - Upper un | Sarasota City | $40,000 |
| Apr 16, 2026 | Residential HVAC | HVAC Changeout - Installation of Champion 4-ton, 16.0 SEER2 split AC and Heat Pump heating system with 8KW heater assembly | North Port City | $12,295 |
Permit status
Where its permits stand, as the departments report them.
- Closed411
- Active3
- Issued2
- Completed2
- Expired1
- Finaled1
- Cancelled1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- PINOS AIR CONDITIONING AND HEAT
- PINOS AIR CONDITIONING AND HEATING
- PINOS AIR CONITIONING AND HEATI
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.