Contractor · Specialty (solar, fire, telecom)

Mackenzie McCord

37 building permits since 2025 in Portsmouth city, NH; Dover city, NH and Rochester city, NH, across 4 counties — $1,883,643 in reported job value over 31 permits that state one.

Building permits
37
Reported job value
$1.9M
Active
2025–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Portsmouth city, NH14
  • Dover city, NH8
  • Rochester city, NH8
  • Methuen city, MA3
  • Amesbury city, MA1
  • Haverhill city, MA1
  • North Andover town, MA1
  • Tyngsborough town, MA1

Permits by year

By issue date (application date where there is none).

01020
19
20252026*
* 2026 is year to date.
View as table
YearPermits
202518
2026 (YTD)19

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers35
  • Remodels3
  • Plumbing3
  • New construction2

Permit types

As the building departments classify them.

  • Fixed Fire Suppression Systems (NFPA 13, 13D, 13R, 17 and 2001)14
  • Fire Sprinkler Systems8
  • Sprinkler System Permit7
  • Fire Sprinkler / Suppression System Installation, Modification, or Alteration3
  • Backflow Prevention Device Permit2
  • Sprinkler Permit (FP-006)1
  • Sprinkler System Install/Repair1
  • Suppression System Installation1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Backflow Prevention Device Permit—Rochester City—
Oct 8, 2026Fire Sprinkler SystemsExisting wet fire sprinkler system to be modified to new ceiling and wall locations on four total floor levels. *This is phase 3 reflecting the 2nd floor only.Dover City$96,145
Oct 5, 2026Fire Sprinkler SystemsExisting wet fire sprinkler system to be modified to new ceiling and wall locations on four total floor levels. *This is phase 4 reflecting the 1st floor only.Dover City$96,145
Oct 2, 2026Sprinkler System Permit—Tyngsborough Town—
Sep 23, 2026Sprinkler System PermitNew building of wood frame construction to be protected with an NFPA 13 compliant wet fire sprinler system.Rochester City$222,000
Sep 10, 2026Backflow Prevention Device Permit—Rochester City—
Sep 3, 2026Fire Sprinkler SystemsExisting wet fire sprinkler system to be modified to new ceiling and wall locations on four total floor levels. *This is phase 2 reflecting the 3rd floor only.Dover City$96,145
Jun 30, 2026Fire Sprinkler / Suppression System Installation, Modification, or AlterationNew sprinkler line to be taken off of existing wet system to feed flex pendant heads in new modular office space and new breakroom area.Methuen Town City$20,269

Permit status

Where its permits stand, as the departments report them.

  • Completed20
  • Active11
  • Issued4
  • Reviews in progress2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.