Contractor · Electrical
LANDMARK REMODELING COMPANY
37 building permits since 2023 in Los Angeles city, CA; Riverside city, CA and Anaheim city, CA, across 3 counties — $15,464 in reported job value over 2 permits that state one.
- Building permits
- 37
- Reported job value
- $15.5K
- Active
- 2023–2026
- Latest permit
- Mar 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA31
- Riverside city, CA2
- Anaheim city, CA1
- Downey city, CA1
- Jurupa Valley city, CA1
- Yorba Linda city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 20 |
| 2026 (YTD) | 15 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical35
- Solar14
- Roofing3
- Battery storage1
Permit types
As the building departments classify them.
- Electrical35
- Residential2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 30, 2026 | Electrical | Remove and reinstall the same solar system (reroof permit bld-26-00516 issued | Downey City | — |
| Mar 23, 2026 | Electrical | Solar pv system: 4.50kw dc / 10 panels / 10 micro inverters / no mpu | Jurupa Valley City | — |
| Mar 12, 2026 | Electrical | Main derate from 200 a to 150 a | Los Angeles City | — |
| Mar 12, 2026 | Electrical | Installation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling. | Los Angeles City | — |
| Mar 4, 2026 | Electrical | 25.2 (dc) 23.0 (ac) kw roof mounted photovoltaic system with 59 panels with (2) powerwall 3 13.5 kwh ess. | Yorba Linda City | — |
| Feb 26, 2026 | Electrical | Photovoltaic system: remove and reinstall solar (ref: bld2021-02815) | Anaheim City | — |
| Feb 24, 2026 | Electrical | Pv1 plan check for new roof mounted pv system. System size is 4.5 kw dc/3.84 kw ac. Scope of work consists of (10) pv modules with (5) microinverters | Los Angeles City | — |
| Feb 23, 2026 | Electrical | Pv 1 installation with 8 pv modules and 4 micro-inverters. Total pv output is 3.07 kw ac | Los Angeles City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated20
- Active8
- Finaled7
- Additional information required2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.