Contractor · Electrical

LANDMARK REMODELING COMPANY

37 building permits since 2023 in Los Angeles city, CA; Riverside city, CA and Anaheim city, CA, across 3 counties — $15,464 in reported job value over 2 permits that state one.

Building permits
37
Reported job value
$15.5K
Active
2023–2026
Latest permit
Mar 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA31
  • Riverside city, CA2
  • Anaheim city, CA1
  • Downey city, CA1
  • Jurupa Valley city, CA1
  • Yorba Linda city, CA1

Permits by year

By issue date (application date where there is none).

01020
20
20232026*
* 2026 is year to date.
View as table
YearPermits
202320
2026 (YTD)15

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical35
  • Solar14
  • Roofing3
  • Battery storage1

Permit types

As the building departments classify them.

  • Electrical35
  • Residential2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2026ElectricalRemove and reinstall the same solar system (reroof permit bld-26-00516 issuedDowney City—
Mar 23, 2026ElectricalSolar pv system: 4.50kw dc / 10 panels / 10 micro inverters / no mpuJurupa Valley City—
Mar 12, 2026ElectricalMain derate from 200 a to 150 aLos Angeles City—
Mar 12, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Mar 4, 2026Electrical25.2 (dc) 23.0 (ac) kw roof mounted photovoltaic system with 59 panels with (2) powerwall 3 13.5 kwh ess.Yorba Linda City—
Feb 26, 2026ElectricalPhotovoltaic system: remove and reinstall solar (ref: bld2021-02815)Anaheim City—
Feb 24, 2026ElectricalPv1 plan check for new roof mounted pv system. System size is 4.5 kw dc/3.84 kw ac. Scope of work consists of (10) pv modules with (5) microinvertersLos Angeles City—
Feb 23, 2026ElectricalPv 1 installation with 8 pv modules and 4 micro-inverters. Total pv output is 3.07 kw acLos Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated20
  • Active8
  • Finaled7
  • Additional information required2

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.