Contractor · Electrical
KINGDOM ELECTRIC LLC
37 building permits since 2021 in Los Angeles city, CA; Sacramento County, CA and Sacramento city, CA, across 6 counties — $53,369 in reported job value over 22 permits that state one.
- Building permits
- 37
- Reported job value
- $53.4K
- Active
- 2021–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA11
- Sacramento County, CA8
- Sacramento city, CA6
- Contra Costa County, CA3
- Burbank city, CA2
- Davis city, CA2
- Elk Grove city, CA2
- Anaheim city, CA1
- Berkeley city, CA1
- Citrus Heights city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 5 |
| 2022 | 6 |
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 20 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical35
- EV chargers9
- HVAC3
- Solar3
- Plumbing3
- Electric meters2
- Windows & doors1
- Water heaters1
Permit types
As the building departments classify them.
- Electrical13
- Single Family6
- MISR5
- E3
- Electrical Service2
- ELECTRIC RESIDENTIAL2
- ONLINE VEHICLE CHARGING PERMIT2
- PANR2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | E | Install a new 60A circuit in the 200A main service panel, hardwire level 2 EV charger (Emporia Pro J1772) and install the Emporia Vue Energy Monitor inside the | Contra Costa County | $890 |
| Oct 5, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install new 40A/240V GFCI circuit for level 2 EV Charger | Elk Grove City | $1,078 |
| Sep 17, 2026 | E | Uninstall / Reinstall rooftop solar system **ORIGINAL COPY OF COUNTY REVIEWED AND STAMPED PVR PLANS REQUIRED TO BE ON-SITE AT TIME OF INSPECTION **LJIANG | Contra Costa County | $1,400 |
| Sep 14, 2026 | MISR | Install new hardwired Level 2 EV charger in garage. New 100A disconnect and dedicated 240V circuit from existing 200A main panel. | Sacramento County | $1,142 |
| Aug 27, 2026 | MISR | Install new 40A GFCI circuit from existing 125A MSP to new NEMA 14-50 receptacle on exterior garage wall for Level 2 EV charger. | Sacramento County | $1,500 |
| Aug 17, 2026 | Electrical | Electrical | Citrus Heights City | $2,000 |
| Jul 24, 2026 | ELECTRIC RESIDENTIAL | NEW CIRC/LIGHTS/OUTLET | Davis City | $2,000 |
| Jul 13, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install hardwired ChargePoint Home Flex EV Charger | Elk Grove City | $750 |
Permit status
Where its permits stand, as the departments report them.
- Issued13
- Not stated12
- Finaled7
- Completed3
- Active1
- Closed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- KINGDOM ELECTRIC
- KINGDOM ELECTRIC COMPANY
- KINGDOM ELECTRIC INC
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.