Contractor · Roofing

Hugo Murillo Rodriguez

37 building permits since 2020 in Providence city, RI; Pawtucket city, RI and Barrington town, RI, across 4 counties — $1,017,177 in reported job value over 36 permits that state one.

Building permits
37
Reported job value
$1M
Active
2020–2026
Latest permit
Aug 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI27
  • Pawtucket city, RI4
  • Barrington town, RI1
  • Bristol town, RI1
  • East Greenwich town, RI1
  • Central Falls city, RI1
  • Lincoln town, RI1
  • Narragansett town, RI1

Permits by year

By issue date (application date where there is none).

048
8
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20203
20216
20228
20236
20248
20251
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing28
  • Remodels1
  • Bathrooms1
  • Electrical1

Permit types

As the building departments classify them.

  • Building Permit19
  • Roofing Permit17
  • EG Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 20, 2026EG Building PermitWe will build in copper trough gutter system, remove the 2 bottom courses and existing lines .we will rip and dispose the existing roof on the front entrance flEast Greenwich Town$16
Jul 20, 2026Building PermitWe will remove the existing rubber on the back and ripped and install new roofPawtucket City$5,000
Jun 24, 2026Building PermitNew front porch and new roof over porch on the front 7x15 front of the house deck includes footings, and back of the house deck will be fixed.Providence City$20,000
Jun 24, 2026Roofing PermitWe will remove the existing roofing on the entire house we will reenforce "in kin" with new slate shingles. We will fabricate and install new copper hasings to Providence City$300,000
May 14, 2026Roofing PermitReplacing chimney flashing and 4 down spouts, remove existing trough gutter liners around entire roof. if necessary insulation in the trough, New rubber roofingProvidence City$64,000
Oct 23, 2025Roofing PermitStrip and re-roof for 1 layer of 15 squares of roofing.Providence City$9,800
Dec 17, 2024Building PermitEntire bathroom remodel, new floors, new titles, gutting entire bathroom, and remove and replace vanity and shower .Providence City$15,000
Nov 27, 2024Building PermitRemoving vinyl siding (12 squares) and not replacing. Cedar siding underneath.Providence City$2,800

Permit status

Where its permits stand, as the departments report them.

  • Active21
  • Completed11
  • Stop work ordered5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.