Contractor · Specialty (solar, fire, telecom)
QUALTEK WIRELESS LLC
425 building permits since 2020 in Los Angeles city, CA; Sacramento city, CA and Sacramento County, CA, across 11 counties — $8,633,979 in reported job value over 316 permits that state one.
- Building permits
- 425
- Reported job value
- $8.6M
- Active
- 2020–2025
- Latest permit
- Mar 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA319
- Sacramento city, CA18
- Sacramento County, CA15
- Mountain View city, CA11
- Riverside city, CA11
- San Diego County, CA8
- Anaheim city, CA7
- Oceanside city, CA7
- Kings County, CA6
- Merced city, CA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 56 |
| 2021 | 159 |
| 2022 | 176 |
| 2023 | 19 |
| 2024 | 6 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom286
- Electrical93
- Remodels23
- Battery storage12
- Roofing4
- Additions4
- Generators3
- Gas1
- HVAC1
Permit types
As the building departments classify them.
- Bldg-Alter/Repair173
- Electrical87
- Nonbldg-Alter/Repair51
- Other Struct (non-bldg)14
- Commercial11
- CBAC9
- BL, CH, EL8
- Nonbldg-New8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 15, 2025 | CBAC | Verizon modifications to existing wireless facility. TOWER WORK: INSTALL (9) ANTENNA(s), (1) OVP, (1) HYBRID CABLE, AND MOUNT MODIFICATIONS GROUND WORK: INSTALL | Sacramento County | $20,000 |
| Mar 15, 2025 | CBAC | Verizon modifications to existing wireless facility. TOWER WORK: REMOVE (3) ANTENNA(s) AND (3) RRU(s) INSTALL (9) ANTENNA(s), (6) RRU(s), (1) OVP, (1) HYBRID CA | Sacramento County | $20,000 |
| Mar 15, 2025 | CBAC | Verizon modifications to existing wireless tower. Remove (12) antennas, (4) radios, (3) RETs, and (8) radios on the ground. Install (19) antennas, (8) radios, a | Sacramento County | $30,000 |
| Mar 15, 2025 | DMOC | Removal of existing Clearwire equipment on rooftop: Monopole and guy wires, antenna and antenna mounts, microwave dish, RRH's, equipment cabinets, cable trays a | Sacramento County | $15,000 |
| Mar 15, 2025 | DMOC | T-Mobile proposes to remove legacy Sprint equipment from the existing monopole located at the subject address. Scope is strictly limited to the removal of Sprin | Sacramento County | $18,000 |
| Oct 28, 2024 | Churches | EPC - T-Mobile proposes to remove legacy Clearwire antennas from the roof of the existing church steeple. The steeple will remain but the antennas within will b | Sacramento | $18,000 |
| Jul 15, 2024 | BLD CELL SITE | T-MOBILE: REMOVE (6) EXISTING PANEL ANTENNAS, REMOVE (3) EXI | Oceanside City | — |
| Jun 5, 2024 | MISC. COMMERCIAL - ALTERATION | — | Camarillo City | $40,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued170
- Not stated112
- Finaled110
- Completed22
- Expired8
- Additional information required2
- Closed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- QUALTEK WIRELESS
- QUAL TEK WIRELESS LLC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.