Contractor · General building

YORKE & CURTIS INC

38 building permits since 1989 in Woodburn city, OR; Tigard city, OR and Medford city, OR, across 6 counties — $14,058,186 in reported job value over 29 permits that state one.

Building permits
38
Reported job value
$14.1M
Active
1989–2026
Latest permit
Oct 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Woodburn city, OR8
  • Tigard city, OR7
  • Medford city, OR6
  • Marion County, OR5
  • Forest Grove city, OR4
  • Eugene city, OR3
  • Roseburg city, OR2
  • Tualatin city, OR2
  • Coos Bay city, OR1

Permits by year

By issue date (application date where there is none).

048
8
19902010201520212026*
* 2026 is year to date.
View as table
YearPermits
19891
19904
20061
20092
20102
20121
20142
20154
20174
20183
20212
20232
20251
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels11
  • Plumbing6
  • Windows & doors6
  • Grading & excavation4
  • Additions4
  • HVAC3
  • Kitchens2
  • Roofing2
  • Generators1
  • Demolition1

Permit types

As the building departments classify them.

  • Commercial Revision7
  • Commercial Structural5
  • Building4
  • Commercial Addition or Alteration4
  • Commercial Deferred Submittal3
  • COMMERCIAL OTHER3
  • Commercial Plumbing3
  • COMMERCIAL NEW2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2026ALTERATION RESIDENTIALHobbs Garage Rebuild - Tree DaTualatin City$35,000
Sep 17, 2026Commercial RevisionHeartwood Assisted Living Various structural RFIs resolving conflicts between design drawings and construction/as-built site conditions. RFI #57 Exterior sheathWoodburn City—
Jul 15, 2026Commercial RevisionHeartwood Assisted Living Generator SubmittalWoodburn City—
Jul 1, 2026Commercial RevisionHeartwood Assisted Living Responses to RFIs 096, 099, 124 which all involve the rooftop mechanical routing (which affects some architectural shaft sizing, and MWoodburn City—
May 5, 2026Commercial RevisionHeartwood Assisted Living Partial kitchen roof changed from a flat roof to a shed roof.Woodburn City—
May 5, 2026Commercial RevisionHeartwood Assisted Living Issued For Construction Set. Incorporates graphic coordination between the disciplines and shows clarifications made to the drawings dWoodburn City—
May 5, 2026Commercial RevisionHeartwood Assisted Living Change in electrical service routing per PGE's revised design. Changes include regrading area around transformer, subsequent storm draWoodburn City—
Apr 3, 2026Commercial RevisionHeartwood Assisted Living Facility Adding a 3" reduced pressure backflow on the domestic water supply line. The backflow will be located in an above grade heateWoodburn City$4,800

Permit status

Where its permits stand, as the departments report them.

  • Closed10
  • Additional information required7
  • Finaled6
  • Issued4
  • New3
  • Active2
  • C/o issued2
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.