Contractor · Specialty (solar, fire, telecom)
Verizon Wireless (Susan Bourgeois) (Susan Bourgeois)
428 building permits since 2019 in Orleans Parish, LA.
- Building permits
- 428
- Reported job value
- —
- Active
- 2019–2024
- Latest permit
- Dec 15, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA428
Permits by year
By issue date (application date where there is none).
075150
137
201920202021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 61 |
| 2020 | 137 |
| 2021 | 128 |
| 2022 | 61 |
| 2023 | 24 |
| 2024 | 17 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom215
- Remodels1
- Roofing1
- Generators1
- Electrical1
- Electric meters1
Permit types
As the building departments classify them.
- Renovation (Non-Structural)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 15, 2024 | — | Install cellular equipment on new platform on roof level. Install a shared backup diesel generator; split between building emergency circuits and Verizon. Insta | Orleans Parish | — |
| Nov 20, 2024 | — | University 087-Verizon is proposing to collo on an existing ATT pole. All the equipment will be placed on the pole. The current pole will NOT have to be replace | Orleans Parish | — |
| Oct 29, 2024 | — | Higgins SC1-Super Bowl High Priority-Verizon is proposing to collocate on an existing Vertical Bridge pole. The pole height will not increase, and the proposed | Orleans Parish | — |
| Sep 5, 2024 | — | SB_Tailgating_SC1-High Priority Super Bowl NODE- Verizon is proposing to replace an existing No Parking sign with a 40' wood pole. The parking sign and all equi | Orleans Parish | — |
| Aug 23, 2024 | — | WW2 Museum SC1- High Priority Super Bowl NODE. Verizon is proposing to install a new stealth concealment pole. The pole will be painted Orleans Green to match t | Orleans Parish | — |
| Aug 15, 2024 | — | FQDT 023-SUPER BOWL HIGH PRIORITY- Verizon is proposing to colocate on Vertical Bridge/Toro Blanco replacement pole. Vzw will be installing 1 antenna on top of | Orleans Parish | — |
| Jul 31, 2024 | — | Lafayette Square SC1-High Priority Super Bowl. Verizon is proposing to colocate on a Vertical Bridge pole. Vertical Bridge will be replacing an existing pole. | Orleans Parish | — |
| Jul 10, 2024 | — | FQDT-270- Super Bowl High priority- Verizon is proposing to collo on an existing streetlight pole. The pole will be replaced with a taller pole and will be pain | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- Closed407
- Issued19
- Finaled1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.