Contractor · Electrical
SUNLUX
428 building permits since 2017 in Los Angeles city, CA; San Diego County, CA and Riverside city, CA, across 8 counties — $1,644,639 in reported job value over 66 permits that state one.
- Building permits
- 428
- Reported job value
- $1.6M
- Active
- 2017–2026
- Latest permit
- Jun 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA245
- San Diego County, CA39
- Riverside city, CA39
- Norwalk city, CA31
- Oceanside city, CA24
- Burbank city, CA11
- Camarillo city, CA9
- Vista city, CA8
- Temecula city, CA7
- Anaheim city, CA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 80 |
| 2019 | 132 |
| 2020 | 68 |
| 2021 | 33 |
| 2022 | 55 |
| 2023 | 34 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical282
- Solar183
- Roofing66
- Battery storage22
- Electric meters7
- EV chargers3
- HVAC1
- Remodels1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical236
- Residential24
- Bldg-Alter/Repair20
- BRES15
- Solar Panel14
- BLD SOLAR PV RES13
- Building Misc - Photovoltaic System (PV)8
- Solar Panel - Residential & PC8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 15, 2026 | Residential | INSTALL PV SOLAR SYSTEM WITH (24) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 10.56 KW AND ENERGY STORAGE SYSTEM | Riverside City | $26,400 |
| Jun 2, 2026 | BLDG - Electrical (R) Finaled | Online Installation of (1 ) Tesla Powerwall 3 ESS/(2 ) Tesla Powerwall 3 Expansion /(1 ) Tesla Backup Switch - Flores Residence | Temecula City | — |
| Mar 12, 2026 | Electrical | Rooftop mounted solar energy system pv+st 20 sil-440qd solar modules 1 1707000-xx-y {11.5kw} inverter 1 1707000-xx-y {11.5kw} ess system size: 8.8 kw dc (11.5 k | Carson City | — |
| Feb 24, 2026 | Electrical | Solar installation- pv+st 10 sil-440qd solar modules 1 1707000-xx-y {240v, 11.5kw} inverter 1 1707000-xx-y {11.5kw} ess system size: 4.4 kw dc (11.5 kw ac) | Whittier City | — |
| Feb 17, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 14.520KW, (33) PANELS, AND 27.0KWH ENERGY STORAGE SYS FOR MAIN HOUSE | Garden Grove City | $26,000 |
| Feb 3, 2026 | Electrical | Symbium-project_d82e0853-0fae-4d12-b153-11811bb16dbd:install 15 pv modules (6.6kw) with tesla inc. Inverter; install 1 ess unit, location = outdoors | Lancaster City | — |
| Jan 28, 2026 | Residential | REVISED 2/2/26 - EXPAND (E) PV SOLAR SYSTEM WITH (96) ADDITIONAL PHOTOVOLTAIC PANELS ON GROUND MOUNT - 44.160 KW DC EXPAND EXISTING GROUND MOUNT PV SOLAR SYSTEM | Riverside City | $139,850 |
| Jan 8, 2026 | Electrical | Main panel upgrade to 200a. Solar under b202600142. | Ontario City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated229
- Finaled92
- Completed68
- Issued21
- Active7
- Expired5
- Additional information required3
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.