Contractor · Specialty (solar, fire, telecom)

MOMENTUM SOLAR

5,168 building permits since 2017 in Queens County, NY; Kings County, NY and Bronx County, NY, across 44 counties — $154,857,146 in reported job value over 4,617 permits that state one.

Building permits
5,168
Reported job value
$154.9M
Active
2017–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Queens County, NY2.1K
  • Kings County, NY751
  • Bronx County, NY388
  • Richmond County, NY323
  • Oyster Bay town, NY285
  • Stratford town, CT127
  • Stamford town, CT114
  • Plainfield town, CT61
  • Bristol town, CT57
  • Colchester town, CT51

Permits by year

By issue date (application date where there is none).

01K2K
2K
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201727
201849
201946
202037
202160
2022103
2023301
20241,999
20251,510
2026 (YTD)1,036

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar4.8K
  • Electrical586
  • Roofing161
  • Electric meters125
  • Remodels13
  • Battery storage5
  • Windows & doors5
  • Additions2
  • Demolition1

Permit types

As the building departments classify them.

  • Solar3.5K
  • SOLAR - RESIDENTIAL281
  • Electrical Permit245
  • Building Permit196
  • Electrical124
  • Solar PV Electrical Permit81
  • Building66
  • Solar Permit55

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Electrical PermitSolar InstallSeymour Town$51,517
Oct 30, 2026Electrical PermitInstalling rooftop railed solar PV 9.02KW and 22 modules.Branford Town$22,288
Oct 30, 2026Residential Building PermitInstalling rooftop railed solar PV 9.02KW and 22 modules.Branford Town$9,552
Oct 30, 2026Solar-ResidentialInstalling rooftop railed solar PV of 8.61 KW and 21 modules. No ESS installation.Walpole Town$10,229
Oct 29, 2026Electrical PermitInstalling rooftop railed solar PV 9.84KW and 24 modules. 200a meter and riser replacement.Stamford Town—
Oct 28, 2026Building PermitInstalling rooftop railed solar PV 9.84KW and 24 modules. 200a meter and riser replacement.Stamford Town$32,669
Oct 27, 2026ElectricalInstalling rooftop railed solar PV 11.07KW and 27 modules.Colchester Town$36,974
Oct 27, 2026Electrical Permit GeneralInstalling rooftop railed solar PV 9.84KW and 24 modules.Glastonbury Town$28,241

Permit status

Where its permits stand, as the departments report them.

  • Finaled1.9K
  • Issued1.7K
  • Completed497
  • Closed388
  • Active387
  • Expired92
  • Approved68
  • Not stated51

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.