Contractor · Specialty (solar, fire, telecom)

John M. Cogswell

38 building permits since 2015 in Fitchburg city, MA; Haverhill city, MA and North Andover town, MA, across 3 counties — $3,000 in reported job value over 1 permits that state one.

Building permits
38
Reported job value
$3K
Active
2015–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fitchburg city, MA34
  • Haverhill city, MA1
  • North Andover town, MA1
  • Canton town, MA1
  • Webster town, MA1

Permits by year

By issue date (application date where there is none).

012.525
25
20152022202320242026*
* 2026 is year to date.
View as table
YearPermits
20151
20222
202325
20246
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers38
  • Plumbing3
  • HVAC1
  • Roofing1
  • Demolition1

Permit types

As the building departments classify them.

  • Sprinkler System Permit33
  • Application for Sprinkler Install or Modification1
  • Building Permit1
  • Fire Suppression Permit1
  • Sprinkler Permit (FP-006)1
  • Sprinkler System Install/Repair1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Sprinkler System PermitShutdown less than 8 hours to repair and retest fire sprinkler back flow preventer. Located at Avery Dennison, 224 Industrial Road, Fitchburg, MA.Fitchburg City—
Oct 13, 2026Application for Sprinkler Install or Modification—Webster Town—
Aug 13, 2026Sprinkler System Permit***TEMPORARY SHUTDOWN*** Shut down less than eight hours each day to retro fit and replace existing 6” Victaulic 768 NXT dry pipe valve with new 6” Reliable FX Fitchburg City—
Aug 11, 2026Sprinkler System Permit***TEMPORARY SHUTDOWN*** Shutdown less than eight hours for scope of work to repair and reset dry fire sprinkler system.Fitchburg City—
Nov 8, 2024Sprinkler System Permit5 year testingFitchburg City—
Jul 29, 2024Sprinkler System PermitService/retest backflow preventers.Fitchburg City—
May 8, 2024Sprinkler System Permit***TEMPORARY SHUTDOWN*** Less than 8 hours. No modifications. Work to conduct NFPA 25 five year testing, inspection, and FDC hydro pressure test.Fitchburg City—
May 8, 2024Sprinkler System PermitClean/replace loaded heads.Fitchburg City—

Permit status

Where its permits stand, as the departments report them.

  • Completed37
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.