Contractor · Plumbing
INTELLIGENT PLUMBING SOLUTIONS LLC
38 building permits since 2020 in St. Louis County, MO; Chesterfield city, MO and Maryland Heights city, MO — $241,400 in reported job value over 38 permits that state one.
- Building permits
- 38
- Reported job value
- $241.4K
- Active
- 2020–2026
- Latest permit
- Oct 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- St. Louis County, MO23
- Chesterfield city, MO4
- Maryland Heights city, MO2
- Valley Park city, MO2
- Bridgeton city, MO1
- Crestwood city, MO1
- Creve Coeur city, MO1
- Olivette city, MO1
- Richmond Heights city, MO1
- Town and Country city, MO1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 7 |
| 2026 (YTD) | 31 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing38
- Water heaters11
- Bathrooms7
- Electrical6
- Kitchens4
- Remodels4
- New construction4
- Gas2
- HVAC1
- Fire sprinklers1
Permit types
As the building departments classify them.
- PLUMBING COMMERCIAL PLUMBING10
- PLUMBING RESIDENTIAL PLUMBING10
- PLUMBING COMMERCIAL BACKFLOW8
- PLUMBING MULTIFAMILY PLUMBING7
- PLUMBING RESIDENTIAL WATER HEATER3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 8, 2026 | PLUMBING COMMERCIAL BACKFLOW | Palm Beach Tan-Replace existing backflow with new 1/2" Backflow in mechanical room to serve the spray tan booths. | St. Louis County | $1,700 |
| Jul 9, 2026 | PLUMBING COMMERCIAL BACKFLOW | (Watson Dental) Replace 1/2" backflow preventer for water line to vacuum pump | St. Louis County | $800 |
| Jul 9, 2026 | PLUMBING COMMERCIAL BACKFLOW | (Watson Dental) Replace 1/2" backflow preventer for water line to vacuum pump | Crestwood City | $800 |
| Jun 30, 2026 | PLUMBING COMMERCIAL PLUMBING | ACCELERATED PLAN REVIEW- Jump Start Learning Center - Install 6 toilets, 10 lavs, 1 prep sink, 1 triple bowl sink, 50 gallon gas water heater, 4 floor drains, 1 | St. Louis County | $15,000 |
| Jun 30, 2026 | PLUMBING COMMERCIAL PLUMBING | ACCELERATED PLAN REVIEW- Jump Start Learning Center - Install 6 toilets, 10 lavs, 1 prep sink, 1 triple bowl sink, 50 gallon gas water heater, 4 floor drains, 1 | Bridgeton City | $15,000 |
| Jun 26, 2026 | PLUMBING RESIDENTIAL PLUMBING | Renovate kitchen, hall bath, primary bath - replacing kitchen faucet, disposal, dishwasher, hall bath - toilet, lav and shower, master bath - 2 lavs, toilet, sh | St. Louis County | $8,000 |
| Jun 26, 2026 | PLUMBING RESIDENTIAL PLUMBING | Renovate kitchen, hall bath, primary bath - replacing kitchen faucet, disposal, dishwasher, hall bath - toilet, lav and shower, master bath - 2 lavs, toilet, sh | Richmond Heights City | $8,000 |
| Jun 5, 2026 | PLUMBING COMMERCIAL BACKFLOW | Palm Beach Tan-Install backflow for spray booth tan | Chesterfield | $600 |
Permit status
Where its permits stand, as the departments report them.
- Completed18
- Void10
- Issued8
- Cancelled2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.