Contractor · Plumbing

Great Day Plumbing and Air

38 building permits since 2022 in Pender County, NC; Surf City town, NC and St. Helena village, NC — $49,800 in reported job value over 7 permits that state one.

Building permits
38
Reported job value
$49.8K
Active
2022–2026
Latest permit
Nov 3, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Pender County, NC33
  • Surf City town, NC4
  • St. Helena village, NC1

Permits by year

By issue date (application date where there is none).

07.515
13
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20237
202413
20259
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing36
  • Gas17
  • Water heaters15
  • Bathrooms6
  • Electrical4
  • Remodels2
  • Additions2
  • HVAC1
  • Heat pumps1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Residential Plumbing Stand Alone Permit19
  • Residential Gas Piping Stand Alone Permit12
  • Commercial Plumbing Stand Alone Permit2
  • Miscellaneous Plumbing2
  • Gas1
  • Residential (Additions/Remodeling)1
  • Residential Mechanical Change-Out Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 3, 2026Residential Gas Piping Stand Alone PermitRun gas line for new range, outdoor grill and existing fireplace. 3/4" galvanized iron, approximately 45'Pender County—
Aug 7, 2026Residential Plumbing Stand Alone PermitInstall water line and backflow for irrigation meter. Running about 200 feet of waterlinePender County—
Jul 17, 2026Residential Gas Piping Stand Alone Permitrun about 25 feet of steel gas line for tankless water heaterPender County—
Jul 17, 2026Residential Mechanical Change-Out Permitchange out existing HVAC equipment, install new 15 seer heat pumpPender County—
Jul 16, 2026Residential Plumbing Stand Alone PermitInstall tankless water heater, install water line for irrigation and backflow, running water line about 200 feet (This is for the tankless water heater only perPender County—
Jul 15, 2026Commercial Plumbing Stand Alone PermitInstall tankless gas water heater, run 200 feet of water line for irrigation, adding backflowPender County$15,000
Apr 15, 2026Residential Plumbing Stand Alone PermitInstall plumbing for modular home, rough in and set 8 fixturesPender County—
Mar 5, 2026Residential Gas Piping Stand Alone PermitRun approximately 100 feet of schedule 40 metallic piping for gas logs, future gas range and tankless water heaterPender County—

Permit status

Where its permits stand, as the departments report them.

  • Expired18
  • Completed10
  • Issued5
  • Void2
  • Cancelled2
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.