Contractor · HVAC

Estrada

38 building permits since 2014 in Los Angeles city, CA — $860,200 in reported job value over 5 permits that state one.

Building permits
38
Reported job value
$860.2K
Active
2014–2023
Latest permit
Apr 27, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA38

Permits by year

By issue date (application date where there is none).

02040
32
2014201920222023
View as table
YearPermits
20141
20191
202232
20234

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC4
  • Additions1
  • Plumbing1
  • Electrical1

Permit types

As the building departments classify them.

  • Elevator30
  • Bldg-Alter/Repair2
  • Bldg-Addition1
  • Electrical1
  • HVAC1
  • Nonbldg-Alter/Repair1
  • Plumbing1
  • Sign1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 27, 2023ElevatorPlan check for hydraulic elevator.Los Angeles City—
Mar 22, 2023ElevatorInstall (1) hydraulic elevator.Los Angeles City—
Mar 2, 2023ElevatorINSTALL (1) CABLED ELEVATOR.Los Angeles City—
Feb 21, 2023ElevatorINSTALLATION OF (1) CABELED ELEVATORLos Angeles City—
Nov 18, 2022ElevatorInstall (1) cabled elevator.Los Angeles City—
Nov 16, 2022HVACREPLACE 2 SUPPLY AND 5 EXHAUST FANS FOR THE EXISTING BOILER ROOM. STRULos Angeles City—
Nov 5, 2022Bldg-Alter/Repaireplan CONVERT EXISTING 3-CAR ATTACHED GARAGE AT 1ST FLOOR OF A 2-STORYLos Angeles City$40,000
Oct 31, 2022Bldg-AdditionPROPOSED ( 26'-6" x 15'-6" ) IRREGULAR SHAPED ADDITION TO THE (E) SINGLos Angeles City$60,000

Permit status

Where its permits stand, as the departments report them.

  • Not stated33
  • Issued3
  • Finaled2

Also on file as

The same name elsewhere

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.