Contractor · General building
David Brooks
38 building permits since 2001 in Gloucester city, MA; Manchester-by-the-Sea town, MA and Boston city, MA, across 4 counties — $6,144,375 in reported job value over 36 permits that state one.
- Building permits
- 38
- Reported job value
- $6.1M
- Active
- 2001–2026
- Latest permit
- Oct 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gloucester city, MA9
- Manchester-by-the-Sea town, MA9
- Boston city, MA9
- Canton town, MA6
- Milton town, MA2
- Easton town, MA1
- Beverly city, MA1
- Ipswich town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2001 | 2 |
| 2007 | 1 |
| 2008 | 1 |
| 2010 | 3 |
| 2011 | 1 |
| 2012 | 2 |
| 2015 | 1 |
| 2016 | 3 |
| 2019 | 2 |
| 2021 | 3 |
| 2023 | 2 |
| 2024 | 7 |
| 2025 | 3 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing13
- Remodels8
- Windows & doors8
- Additions6
- Bathrooms6
- Kitchens2
- Accessory dwelling units1
- Gas1
- HVAC1
- Plumbing1
Permit types
As the building departments classify them.
- Building Permit24
- RESI.4
- EXTREN2
- ROOF2
- EXTDEM1
- INTREN1
- NEWCON1
- OTHER1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 20, 2026 | Building Permit | The proposed project includes the reconfiguration and expansion of the existing Entryway and the construction of a new exterior deck extending along two sides o | Gloucester City | $878,700 |
| Oct 12, 2026 | Building Permit | The proposed project includes the expansion of the existing second-floor bedroom through the construction of a new dormer, along with an extension of the existi | Gloucester City | $198,000 |
| Aug 28, 2026 | Building Permit | Alterations to second floor living space including the reclocation and expansion of bedrooms and an ensuite bathroom. Supplumental work will include replacement | Gloucester City | $97,500 |
| Aug 19, 2026 | Building Permit | Expand finished basement space unfinished space. Including alterations to bedroom, bathroom, living area, and closets. Install additional EEROs per plan. | Gloucester City | $48,000 |
| Jul 30, 2026 | Building Permit | Convert and expand finished basement space for an ADU. | Gloucester City | $60,000 |
| Apr 23, 2026 | Building Permit | Work included replacement of rooftop deck material for previously permitted occupied roof completed in 2013, the addition of a raised pergola approved by ZBA 8/ | Gloucester City | $152,250 |
| Jan 28, 2026 | Building Permit | The proposed scope of work includes the construction of a new second-floor bathroom located between the primary bedroom and guest bedroom. Additional improvemen | Manchester-By-The-Sea Town | $220,000 |
| Oct 17, 2025 | OTHER | OTHER | Boston City | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active11
- Closed5
- Issued2
- Stop work ordered2
- Finaled1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.