Contractor · Plumbing

ACQUA PLUMBING LLC

38 building permits since 2017 in Tacoma city, WA — $296,390 in reported job value over 34 permits that state one.

Building permits
38
Reported job value
$296.4K
Active
2017–2025
Latest permit
Oct 9, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA38

Permits by year

By issue date (application date where there is none).

036
6
20172019202120232025
View as table
YearPermits
20173
20181
20196
20206
20215
20224
20236
20242
20255

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing23
  • Bathrooms5
  • Kitchens4
  • Accessory dwelling units2
  • HVAC2
  • Remodels2
  • Electrical2
  • Water heaters2
  • Gas1
  • Grading & excavation1

Permit types

As the building departments classify them.

  • Utility Connection22
  • Building14
  • Site2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 9, 2025BuildingInstallation of a new tankless hot water heater, at SFDTacoma City$2,500
Sep 18, 2025BuildingInstall new 1/2 pex line with new angle stop 1/2 pex x 3/8 valve and overflow drain for coffee machine at BAS QUE Bakery.Tacoma City$1,500
Feb 27, 2025BuildingUpdate bathroom fixtures with ADA-compliant onesTacoma City$2,890
Feb 27, 2025BuildingAlter existing restrooms into an ADA restroom *Separate Plumbing and Mechanical Permits required for those scopes*Tacoma City$10,000
Jan 15, 2025Building2327 Tacoma Ave S - add new drain, waste & vent line also new hot/cold water lines as per drawings provided to JOEL R city of TacomaTacoma City$10,000
Sep 23, 2024SiteInstallation of a 750-gallon Grease Interceptor. Includes Site work associated with BLDCA22-0456 including driveway removal/replacement, onsite paving, parking Tacoma City$35,000
Sep 23, 2024Utility ConnectionNew sanitary sewer for 750gal grease interceptor in parking lot. New 4 inch 40-50 foot long grease way line from the building grease producing fixtures to the gTacoma City—
Jun 6, 2023Utility ConnectionOPEN TRENCH REPAIR OF THE SANITARY SEWER ON PRIVATE PROPERTY. NO RIGHT OF WAY WORK OR PATCH INCLUDED.Tacoma City$5,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled17
  • Cancelled7
  • Issued6
  • Void3
  • Expired3
  • Closed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.