Contractor · Specialty (solar, fire, telecom)
csl steve kelly/sunrun installation services
434 building permits since 2022 in Falmouth town, MA; Randolph Town city, MA and Attleboro city, MA, across 4 counties — $7,579,963 in reported job value over 207 permits that state one.
- Building permits
- 434
- Reported job value
- $7.6M
- Active
- 2022–2026
- Latest permit
- May 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA124
- Randolph Town city, MA85
- Attleboro city, MA65
- Bridgewater Town city, MA58
- Stoughton town, MA31
- Sandwich town, MA17
- Hanson town, MA16
- Fairhaven town, MA11
- Easton town, MA9
- West Bridgewater town, MA7
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2023 | 22 |
| 2024 | 68 |
| 2025 | 205 |
| 2026 (YTD) | 137 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar327
- Battery storage116
- Roofing10
- Electrical4
- Remodels3
- Electric meters3
Permit types
As the building departments classify them.
- RESI.399
- BUILD30
- REP3
- ELECT.2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 13, 2026 | RESI. | install 41 roof mounted photovoltaic solar panels 16.81kw. no structural work needed at site 1 franklin lithium iron phosphate battery - 1 agate x control panel | Hanson Town | $113,700 |
| May 13, 2026 | RESI. | installation of roof mounted photovoltaic solar systems, 16 panels 6.56kw. no structural work needed at site 1 franklin lithium iron phosphate battery to be ins | Hanson Town | $67,800 |
| May 13, 2026 | RESI. | installation of roof mounted photovoltaic solar systems, 34 panels 13.94kw. no structural work needed at site (1) franklin lithium iron phosphate battery to be | Hanson Town | $58,524 |
| Apr 27, 2026 | BUILD | Install 29 roof mounted solar panels 11.745kW. No structural work needed at site (1) FRANKLIN LITHIUM IRON PHOSPHATE BATTERY - (1) 280A AGATE X CONTROL PANEL to | Stoughton Town | $44,687 |
| Apr 15, 2026 | RESI. | — | Attleboro City | — |
| Apr 15, 2026 | RESI. | — | Attleboro City | — |
| Apr 14, 2026 | RESI. | install 24 roof mounted solar panels 9.84kw. no structural work needed at site (1) franklin lithium iron phosphate battery - (1) 280a agate x control panel to b | West Bridgewater Town | $28,154 |
| Apr 9, 2026 | RESI. | installation of roof mounted photovoltaic solar systems, 19 panels 8.55kw. no structural work needed at site (1) franklin battery - (1) 280a agate x control pan | Randolph Town City | $31,826 |
Permit status
Where its permits stand, as the departments report them.
- Issued138
- Completed104
- Closed99
- Finaled45
- Withdrawn26
- Pending payment9
- Cancelled7
- Pending4
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.