Contractor · Specialty (solar, fire, telecom)

csl steve kelly/sunrun installation services

434 building permits since 2022 in Falmouth town, MA; Randolph Town city, MA and Attleboro city, MA, across 4 counties — $7,579,963 in reported job value over 207 permits that state one.

Building permits
434
Reported job value
$7.6M
Active
2022–2026
Latest permit
May 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA124
  • Randolph Town city, MA85
  • Attleboro city, MA65
  • Bridgewater Town city, MA58
  • Stoughton town, MA31
  • Sandwich town, MA17
  • Hanson town, MA16
  • Fairhaven town, MA11
  • Easton town, MA9
  • West Bridgewater town, MA7

Permits by year

By issue date (application date where there is none).

0125250
205
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
202322
202468
2025205
2026 (YTD)137

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar327
  • Battery storage116
  • Roofing10
  • Electrical4
  • Remodels3
  • Electric meters3

Permit types

As the building departments classify them.

  • RESI.399
  • BUILD30
  • REP3
  • ELECT.2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 13, 2026RESI.install 41 roof mounted photovoltaic solar panels 16.81kw. no structural work needed at site 1 franklin lithium iron phosphate battery - 1 agate x control panelHanson Town$113,700
May 13, 2026RESI.installation of roof mounted photovoltaic solar systems, 16 panels 6.56kw. no structural work needed at site 1 franklin lithium iron phosphate battery to be insHanson Town$67,800
May 13, 2026RESI.installation of roof mounted photovoltaic solar systems, 34 panels 13.94kw. no structural work needed at site (1) franklin lithium iron phosphate battery to be Hanson Town$58,524
Apr 27, 2026BUILDInstall 29 roof mounted solar panels 11.745kW. No structural work needed at site (1) FRANKLIN LITHIUM IRON PHOSPHATE BATTERY - (1) 280A AGATE X CONTROL PANEL toStoughton Town$44,687
Apr 15, 2026RESI.—Attleboro City—
Apr 15, 2026RESI.—Attleboro City—
Apr 14, 2026RESI.install 24 roof mounted solar panels 9.84kw. no structural work needed at site (1) franklin lithium iron phosphate battery - (1) 280a agate x control panel to bWest Bridgewater Town$28,154
Apr 9, 2026RESI.installation of roof mounted photovoltaic solar systems, 19 panels 8.55kw. no structural work needed at site (1) franklin battery - (1) 280a agate x control panRandolph Town City$31,826

Permit status

Where its permits stand, as the departments report them.

  • Issued138
  • Completed104
  • Closed99
  • Finaled45
  • Withdrawn26
  • Pending payment9
  • Cancelled7
  • Pending4

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.