Contractor · Plumbing
BEN LEWIS PLUMBING
434 building permits since 2021 in Howard County, MD — $2,000,000 in reported job value over 1 permits that state one.
- Building permits
- 434
- Reported job value
- $2M
- Active
- 2021–2024
- Latest permit
- Aug 26, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD434
Permits by year
By issue date (application date where there is none).
075150
145
2021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 140 |
| 2022 | 54 |
| 2023 | 145 |
| 2024 | 95 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing434
- Gas425
- Kitchens425
- Water heaters425
- HVAC424
- Bathrooms424
- Remodels9
- Additions9
- New construction9
- Electrical2
Permit types
As the building departments classify them.
- Residential New Plumbing Permit424
- Residential Plumbing Addition Alteration Permit7
- Commercial Plumbing Addition Alteration Permit2
- Commercial Plumbing New Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 26, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
| Aug 26, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
| Aug 26, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SUMP PUMP / 2-SILL COCKS / (FIRST FLOOR) / 1-LAV / 1-WATE | Howard County | — |
| Aug 26, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
| Aug 26, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SUMP PUMP / 2-SILL COCKS / (FIRST FLOOR) / 1-LAV / 1-WATE | Howard County | — |
| Jul 22, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
| Jul 22, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
| Jul 22, 2024 | Residential New Plumbing Permit | CHAPELGATE // NEW SFTH // INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// (BASEMENT) / 1-SHOWER / 1-LAV / 1-WATER CLOSET / 1-SUMP PUMP / 2-SILL CO | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed432
- Cancelled2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.