Contractor · Specialty (solar, fire, telecom)
SUNBROOK SOLAR POWER & ELECTRICAL SYSTEMS INC
39 building permits since 2020 in San Diego County, CA; Temecula city, CA and Vista city, CA, across 2 counties — $37,000 in reported job value over 1 permits that state one.
- Building permits
- 39
- Reported job value
- $37K
- Active
- 2020–2026
- Latest permit
- Mar 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Diego County, CA32
- Temecula city, CA3
- Vista city, CA2
- Riverside city, CA1
- San Diego city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 9 |
| 2021 | 13 |
| 2022 | 3 |
| 2023 | 11 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar35
- Battery storage6
- Electrical6
- Roofing1
- EV chargers1
- Electric meters1
Permit types
As the building departments classify them.
- BLDG - Building (R)2
- Building Misc - Photovoltaic System (PV)2
- BLDG - Electrical (R)1
- Electrical1
- Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 12, 2026 | Electrical | — | San Diego City | — |
| Jun 19, 2025 | BLDG - Building (R) | Online roof mount solar 32 panels 11.57 kw 2 inverters / 2 batteries | Temecula City | — |
| Sep 11, 2024 | BLDG - Electrical (R) | Online. 20A Receptacle Circuit for BBQ. Wilson residence | Temecula City | — |
| Sep 21, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does n | San Diego County | — |
| Jul 10, 2023 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM AND 225 AMP ELECTRIC METER PANEL UPGRADE | Vista City | — |
| Jun 7, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| May 9, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| Apr 18, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Issued23
- Active12
- Finaled3
- Completed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- SUNBROOK SOLAR POWER AND AMP ELECTRICAL SYSTEMS INC
- SUNBROOK SOLAR POWER AND ELECTRICAL SYSTEMS
- SUNBROOK SOLAR POWER AND ELECTRICAL SYSTE
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.