Contractor · Specialty (solar, fire, telecom)
N P MECHANICAL INC
39 building permits since 2014 in Los Angeles city, CA.
- Building permits
- 39
- Reported job value
- —
- Active
- 2014–2022
- Latest permit
- Sep 15, 2022
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Los Angeles city, CA39
Permits by year
By issue date (application date where there is none).
01020
19
201420152022
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 19 |
| 2015 | 6 |
| 2022 | 14 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Fire sprinklers29
- Plumbing7
- HVAC3
Permit types
As the building departments classify them.
- Fire Sprinkler29
- Plumbing7
- HVAC3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 15, 2022 | Fire Sprinkler | New NFPA 13D Fire Sprinkler System. 8" Master water meter with 8" Bac | Los Angeles City | — |
| Sep 15, 2022 | Fire Sprinkler | New NFPA 13D Fire Sprinkler System. 8" Master water meter with 8" Bac | Los Angeles City | — |
| Sep 15, 2022 | Fire Sprinkler | New NFPA 13D Fire Sprinkler System. 8" Master water meter with 8" Bac | Los Angeles City | — |
| Sep 15, 2022 | Fire Sprinkler | INSTALLATION OF NFPA 13D SYSTEM. 8" DOMESTIC (SHARED) WATER METER. 8" | Los Angeles City | — |
| Jul 7, 2022 | Plumbing | Rainwater catchment system | Los Angeles City | — |
| May 3, 2022 | HVAC | INSTALLATION OF HAVC SYSTEM IN AN APARTMENT BUILDING AND CORE & SHELL | Los Angeles City | — |
| Apr 19, 2022 | HVAC | REVISION TO PREVIOUSLY APPROVED PLANS. REVISING ALL DUCTWORK LAYOUT ON | Los Angeles City | — |
| Feb 17, 2022 | Plumbing | DUPLEX SUMP PUMP SYSTEM. | Los Angeles City | — |
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.