Contractor · Plumbing
NICOSIA MECHANICAL CONTRACTING INC.
39 building permits since 2014 in Eastchester town, NY; White Plains city, NY and Larchmont village, NY — $143,765 in reported job value over 18 permits that state one.
- Building permits
- 39
- Reported job value
- $143.8K
- Active
- 2014–2026
- Latest permit
- Aug 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Eastchester town, NY17
- White Plains city, NY15
- Larchmont village, NY3
- Bronxville village, NY1
- Yorktown town, NY1
- Mount Kisco village, NY1
- Ossining village, NY1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 2 |
| 2015 | 1 |
| 2016 | 3 |
| 2017 | 5 |
| 2018 | 6 |
| 2019 | 9 |
| 2020 | 3 |
| 2021 | 1 |
| 2022 | 2 |
| 2023 | 3 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing34
- Gas18
- HVAC16
- Kitchens7
- Bathrooms7
- Water heaters5
- Remodels4
- Electrical3
- Additions1
- Generators1
Permit types
As the building departments classify them.
- PLUMB17
- RES - PLBG6
- COM - PLBG4
- PLUMBING3
- RES - BOILER3
- Plumbing2
- COM - BOILER1
- PLUMB & DRAIN1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 10, 2026 | PLUMB | KITCHEN REMODEL. | Eastchester Town | — |
| Jan 31, 2025 | PLUMB | INSTALLATION OF WATER SERVICE FROM CURB BOX TO WATER METER. | Eastchester Town | — |
| Apr 3, 2024 | PLUMB | REPAIR 4" WATER SERVICE. | Eastchester Town | — |
| Feb 23, 2024 | PLUMB | REPAIR LEAKS ON GAS LINES - 3 METERS IN SOUTH SIDE OF BUILDING. BASEMENT PIPING GOES TO 2 ROOF TOP UNITS AND 1 SMALL BOILER IN BASEMENT. | Eastchester Town | — |
| May 19, 2023 | PLUMB | GAS SHUT DOWN BY CON-ED. NEED TO MAKE REPAIRS AND PERFORM INTEGRITY TEST (METER ROOM). | Eastchester Town | — |
| May 3, 2023 | PLUMB | (419 WHITE PLAINS RD) REPLACE EXISTING BOILER WITH A NEW BURNHAM GAS FIRED BOILER. | Eastchester Town | — |
| Feb 15, 2023 | PLUMB | WHITE PLAINS HOSPITAL - INSTALL 6' NO - HUB STACK. INSTALL 2' WATER LINE AND SUB METER. INSTALL CLASS 1000 METER BAR AND STUB OUT GAS LINE INTO SPACE. | Eastchester Town | — |
| Apr 29, 2022 | PLUMBING | REMOVE A BACK OIL FIRED WATER HEAT. INSTALL A HYBRID HEAT PUMP / ELECTRIC WATER HEATER. REMOVAL AND PROPER DISPOSAL OF EXISTING 275 GALLON OIL TANK. | Yorktown Town | — |
Permit status
Where its permits stand, as the departments report them.
- Closed26
- Issued6
- C/o issued3
- Active2
- Void1
- Abandoned1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- NICOSIA MECHANICAL CONT
- NICOSIA MECHANICAL CONTRACTING
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.