Contractor · General building

E&G PLUMBING LLC

39 building permits since 2021 in Howard County, MD.

Building permits
39
Reported job value
—
Active
2021–2024
Latest permit
Oct 18, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD39

Permits by year

By issue date (application date where there is none).

07.515
15
2021202220232024
View as table
YearPermits
20211
202215
202311
202412

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing39
  • Bathrooms27
  • Kitchens21
  • Gas20
  • Additions19
  • HVAC17
  • Remodels17
  • Water heaters17
  • Fire sprinklers13
  • New construction5

Permit types

As the building departments classify them.

  • Residential New Plumbing Permit19
  • Residential Plumbing Addition Alteration Permit13
  • Commercial Plumbing Addition Alteration Permit4
  • Express Plumbing Permit2
  • Commercial Plumbing New Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 18, 2024Residential Plumbing Addition Alteration PermitSFD/we will be adding 2 vanitys,1 toilet and 2 shower, moving 1 kitchen conn, 1 ice maker, 1 dishwasher conn, 1 toilet, 1 vanity on main levelHoward County—
Sep 17, 2024Residential Plumbing Addition Alteration PermitSFD/1ST FLOOR/we will be removing and relocating 1 ice maker, 1 dishwasher, 1 kitchen sink on first floor. adding 1 hosebibeHoward County—
Sep 17, 2024Residential Plumbing Addition Alteration PermitSFD/BASEMENT/we will be removing and relocating 1 washer box, and 1 laundry tray. we will be adding 1 shower, 1 toilet, 1 vanity, 1 sewage ejector pit with pumpHoward County—
Aug 15, 2024Residential Plumbing Addition Alteration PermitSFD/on the first floor we will be moving the kitchen drain and water lines to a new locationHoward County—
Aug 14, 2024Express Plumbing Permitreplace failing sewer line to street with pvc pipeHoward County—
Jul 22, 2024Residential Plumbing Addition Alteration PermitSFD/first floor install 2 vanitys, 1 toilet, 1 shower, 1 tubHoward County—
Jul 10, 2024Residential Plumbing Addition Alteration PermitSFD/install new plumbing in addition on first floor and tie sewer and water into existing house connections. install 1 toilet, 1 freestanding tub, 2 vanities, 1Howard County—
May 14, 2024Residential New Plumbing Permitsign at entrance of subdivision. install water line and backflow preventer for irrigation, zurn wilkins 720a atmospheric vaccum breakerHoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed36
  • Issued2
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.