Contractor · Roofing

EDWARD DUNLAP

39 building permits since 2018 in Buffalo city, NY — $8,356,136 in reported job value over 39 permits that state one.

Building permits
39
Reported job value
$8.4M
Active
2018–2026
Latest permit
Oct 7, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY39

Permits by year

By issue date (application date where there is none).

07.515
11
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20183
20201
202111
20224
20237
20241
20257
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing34
  • HVAC2
  • Plumbing2
  • Electrical1

Permit types

As the building departments classify them.

  • REPAIR39

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 7, 2026REPAIRTear off EPDM and ISO to BUR Vapor Barrier.Adhere R-33 tapered ISO system and crickets.Adhere new 60 Mil TPO.Install new metal edge.Flash all penetrations as spBuffalo City$979,800
Oct 7, 2026REPAIRRock vac to be completed by others.Remove existing roof down to vapor barrier.Adhere 2 layers of 2.6" poly-iso using low-rise foam.Adhere a layer of 1/2" SecuRoBuffalo City$253,950
Oct 5, 2026REPAIRRelief cut existing EPDM membrane. Fasten 1.2” Polyiso. Install 60 mil TPO RhinoBond. Install Term Bar and Slip Flash at perimeters. Flash all penetrations as sBuffalo City$246,000
Aug 25, 2026REPAIRRemove and dispose of rock ballast. Relief cut existing EPDM membrane. Inspect insulation and decking for any wet or deteriorated areas. Replace as needed. InstBuffalo City$446,000
May 13, 2026REPAIRRoofing work on two sections. Section #1 - Total tear, down to deck. Replaced with code insulation (R30). Install 60 mil TPO membrane. Section #2 - Slope mansarBuffalo City$145,000
Nov 5, 2025REPAIRRemove and dispose of the existing roof down to the BUR vapor barrier Mechanically fasten 2 layer of 2.6" polyiso (R-30) Furnish and install new 60 mil TPO membBuffalo City$99,700
Oct 20, 2025REPAIRPressure wash the existing roof surface Relief cut the existing membrane in a 10'x10' grid pattern Remove, dispose of, and replace any existing wet insulation. Buffalo City$928,000
Sep 22, 2025REPAIRRemove and dispose of the existing roof over main section down to the built-up vapor barrier. Remove and dispose of existing roof over entrance and drive-thru sBuffalo City$80,350

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.