Contractor · Electrical

Tesla

40 building permits since 2000 in Mesa city, AZ and Phoenix city, AZ — $639,265 in reported job value over 37 permits that state one.

Building permits
40
Reported job value
$639.3K
Active
2000–2026
Latest permit
Oct 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ35
  • Phoenix city, AZ5

Permits by year

By issue date (application date where there is none).

0510
9
20052019202120242026*
* 2026 is year to date.
View as table
YearPermits
20001
20053
20181
20193
20201
20214
20221
20248
20256
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical35
  • Battery storage27
  • Solar23
  • Electric meters18
  • EV chargers8

Permit types

As the building departments classify them.

  • Electrical35
  • DEM3
  • BLD1
  • S1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 9, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$24,464
Oct 8, 2026ElectricalINSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN CARPORT, SOON TO BE CONVERTED TO A GARAGE UNDER SEPARATE PERMITMesa$585
Sep 29, 2026ElectricalINSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER ON THE EXTERIOR OF THE HOME. EXISTING 200 AMP SERVICE METER. ELECTMesa$535
Sep 17, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIMesa$14,000
Jun 25, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF THREE TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVMesa$52,752
May 26, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURMesa$21,000
Apr 22, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF THREE TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$35,288
Feb 25, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTMesa$39,931

Permit status

Where its permits stand, as the departments report them.

  • C/o issued28
  • Issued4
  • Expired3
  • Completed2
  • Pending payment1
  • Reviews in progress1
  • Additional information required1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.