Contractor · Electrical
PAMLICO SOLAR LLC DBA: PAMLICO POWER
40 building permits since 2023 in Piney Green CDP, NC; Half Moon CDP, NC and Jacksonville township, NC — $1,139,525 in reported job value over 32 permits that state one.
- Building permits
- 40
- Reported job value
- $1.1M
- Active
- 2023–2025
- Latest permit
- Nov 5, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Piney Green CDP, NC19
- Half Moon CDP, NC8
- Jacksonville township, NC5
- Stump Sound township, NC3
- Swansboro township, NC2
- White Oak township, NC2
- Richlands township, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 22 |
| 2024 | 9 |
| 2025 | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar37
- Electrical27
- Battery storage8
- Gas1
- Plumbing1
- Generators1
- EV chargers1
Permit types
As the building departments classify them.
- Residential Electrical - Residential Electrical.216
- Residential Accessory - Solar Panels - Roof Mounted15
- Residential Electrical - New6
- Residential Accessory1
- Residential Electrical - Change Out1
- Residential Electrical - Service Pole1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 5, 2025 | Residential Electrical - Service Pole | Install (1) outdoor RV pedestal approx 300 ft. from existing 200A outdoor Main Service Panel. Power will be supplied from the feed-through lugs of the 200A Main | Jacksonville township | — |
| Sep 9, 2025 | Residential Accessory - Solar Panels - Roof Mounted | INSTALL ROOF MOUNTED SOLAR SYSTEM AND BATTERY STORAGE, UPGRADING 200AMP MAIN SERVICE PANEL REVSION 1: UPDATE ELECTRICAL PLANS TO MATCH SCOPE OF WORK | Jacksonville township | $31,488 |
| Sep 4, 2025 | Residential Electrical - Residential Electrical.2 | INSTALL ROOF MOUNTED SOLAR SYSTEM AND BATTERY STORAGE, UPGRADING 200AMP MAIN SERVICE PANEL | Jacksonville township | $31,488 |
| May 23, 2025 | Residential Accessory - Solar Panels - Roof Mounted | Installation of rooftop solar & battery. Includes all correlating electrical & structural equipment. Will need utility reconnect inspection | Piney Green CDP | $10,000 |
| May 21, 2025 | Residential Electrical - Residential Electrical.2 | Installation of rooftop solar & battery. Includes all correlating electrical & structural equipment. Will need utility reconnect inspection | Piney Green CDP | $10,000 |
| Apr 11, 2025 | Residential Electrical - New | Installing new battery storage to existing rooftop solar system. Battery Storage Integration to existing solar system | Stump Sound township | — |
| Jan 28, 2025 | Residential Accessory - Solar Panels - Roof Mounted | Residential Rooftop Solar + Battery | Piney Green CDP | $72,651 |
| Jan 24, 2025 | Residential Electrical - Residential Electrical.2 | Residential Rooftop Solar + Battery | Piney Green CDP | $72,651 |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Approved16
- Void7
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.