Contractor · Electrical
John Boney
40 building permits since 2023 in Lenoir County, NC and Greene County, NC, across 2 counties — $46,000 in reported job value over 2 permits that state one.
- Building permits
- 40
- Reported job value
- $46K
- Active
- 2023–2026
- Latest permit
- Sep 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lenoir County, NC35
- Greene County, NC5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 4 |
| 2024 | 16 |
| 2025 | 8 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical38
- Electric meters13
- Gas2
- HVAC2
- Remodels1
- EV chargers1
Permit types
As the building departments classify them.
- Electric Permit Application33
- Electrical Permit Application5
- Commercial Building Permit Application1
- Residential Building Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 14, 2026 | Electric Permit Application | The conduit bent on the meterbase. We will remove and replace conduit/hub. | Lenoir County | — |
| Aug 24, 2026 | Electric Permit Application | One of the service entrance lines burnt at the weather head. Utilities disconnected power Friday evening. We removed and replaced the weather head and pulled en | Lenoir County | — |
| Aug 18, 2026 | Electric Permit Application | We will remove the old meterbase and install a new meterbase. | Lenoir County | — |
| Aug 17, 2026 | Electric Permit Application | A tree limb fell on the line and broke the neutral at the weatherhead. We pulled some extra slack in the wire and it's ready to be re-connected. | Lenoir County | — |
| Jul 23, 2026 | Electric Permit Application | Tree limb fell and broke the mast at the meter base. We are replacing the conduit/weatherhead. | Lenoir County | — |
| Jul 14, 2026 | Electric Permit Application | Remove old meter base. Install new 200 amp disconnect box. | Lenoir County | — |
| May 14, 2026 | Electric Permit Application | We will be removing the old meter base and inside fuse box and installing a new meter base disconnect box and inside circuit breaker panel. | Lenoir County | — |
| May 12, 2026 | Electric Permit Application | Panel box was showing unbalanced load. We had utilities check and power was proper on their side. We are just going to remove the old wire and put in new wire ( | Lenoir County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed38
- Active1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.