Contractor · General building

GATHER CONSTRUCTION, LLC

40 building permits since 2024 in Citrus County, FL and Crystal River city, FL — $75,075 in reported job value over 3 permits that state one.

Building permits
40
Reported job value
$75.1K
Active
2024–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL35
  • Crystal River city, FL5

Permits by year

By issue date (application date where there is none).

01020
19
202420252026*
* 2026 is year to date.
View as table
YearPermits
20243
202518
2026 (YTD)19

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels8
  • HVAC7
  • Additions5
  • Electrical5
  • Demolition4
  • Windows & doors4
  • New construction4
  • Bathrooms3
  • Heat pumps3
  • Pools & hot tubs2

Permit types

As the building departments classify them.

  • Amendment8
  • Residential8
  • Accessory Structure5
  • Building5
  • Demolition4
  • Addition/Renovation2
  • Concrete2
  • Deck/Foundation/Slab/Wall1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026Accessory StructureNew metal shed/garage with concrete foundation. No electric, no plumbing, no HVAC. ** RECORDED NOC REQUIRED FOR NEW METAL SHED IN OR BK: 3719 PG: 1425 **Citrus County—
Oct 27, 2026AmendmentStormwater revisionCitrus County—
Oct 26, 2026Permit RevisionENCLOSING LANAI WITH PGT WINDOWS AND SLIDING GLASS DOOR USING 2"X4" (.125") WHITE ALUMINUM FRAMING RAISING SLAB TI EXISTING DOOR ON HOUSECitrus County—
Oct 23, 2026AmendmentNew engineering reflecting two sets of stairs. on left side and set for mechanical as per EOR notes and comments. Addition of flood vents as per EOR notes/commeCitrus County—
Oct 7, 2026Miscellaneous RequestATF (CE202601244) (10584) Concrete Sidewalk due to Amended notice of violation - some of the after the fact concrete walk ways had to be changed to stepping stoCitrus County—
Sep 29, 2026DemolitionDEMOLITION OF EXISTING SFD AND LEAVE FOUNDATION FOR REPLACEMENT STORAGE BUILDINGCitrus County—
Sep 26, 2026ConcreteAfter the Fact Concrete Sidewalk due to Amended notice of violation - some of the ater the fact concrete walk ways had to be changed to stepping stones to remaiCitrus County—
Sep 18, 2026ResidentialNEW RESIDENTIAL SINGLE FAMILY ** NOC OR BK 3708 PG 1323 FOR NEW RESIDENTIAL SFD ** SITE REVIEW APPROVED FOR SFD ONLY, MINIMUM OF 9 TREES TO REMAIN ** FLOOD ZONECitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed18
  • Issued6
  • Cancelled5
  • Expired3
  • Finaled3
  • Additional information required2
  • Pending1
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.