Contractor · HVAC
Needham Mechanical Systems Inc
41 building permits since 2015 in Brookline town, MA; Framingham city, MA and Falmouth town, MA, across 4 counties — $1,332,477 in reported job value over 35 permits that state one.
- Building permits
- 41
- Reported job value
- $1.3M
- Active
- 2015–2026
- Latest permit
- Sep 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Brookline town, MA35
- Framingham city, MA4
- Falmouth town, MA1
- Bolton town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 3 |
| 2017 | 3 |
| 2018 | 5 |
| 2019 | 4 |
| 2020 | 5 |
| 2021 | 1 |
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 8 |
| 2025 | 2 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC36
- Bathrooms23
- Kitchens9
- Heat pumps7
- Gas3
- Remodels2
- Additions2
- Roofing1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Residential Mechanical - Sheet Metal20
- Residential Mechanical15
- Res Sheet Metal3
- Com Sheet Metal1
- Sheet Metal Permit1
- SHT MTL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 30, 2026 | Residential Mechanical - Sheet Metal | Vent one bath fan to existing wall cap ALL WORK MUST COMPLY WITH 780 CMR & BROOKLINE BY-LAWS | Brookline Town | $1,000 |
| Jun 3, 2026 | Residential Mechanical - Sheet Metal | 35 Walnut Pl Replace existing cooling only systems with three-hydro air, dual fuel, multi zone, heat pump systems. 780 CMR and Town Bylaws apply | Brookline Town | $146,400 |
| Mar 31, 2026 | Residential Mechanical - Sheet Metal | 7 Dana st Replace furnace and add-on cooling in basement. Replace basement ductwork feeding first floor as allowable and modify existing register boxes and bran | Brookline Town | $22,700 |
| Jan 13, 2026 | Residential Mechanical - Sheet Metal | 7 Dana Install new ducted Bosch Heat pump system and ductwork on second floor. System zoned for second and third floors. Disconnect and modify existing basement | Brookline Town | $48,555 |
| Nov 12, 2025 | Residential Mechanical - Sheet Metal | 97 LAUREL Replacement Hydro air system including new ductwork for the renovated kitchen area. Various modifications of ductwork throughout first floor and secon | Brookline Town | $58,059 |
| Apr 2, 2025 | Residential Mechanical - Sheet Metal | 86 addington rd duct modification/relocation, bath and stove hood vent, make up air system ** ALL WORK MUST BE IN ACCORDANCE WITH 780 CMR AND BROOKLINE ZONING B | Brookline Town | $14,900 |
| Oct 30, 2024 | Residential Mechanical - Sheet Metal | 624 NEWTON ST Install two (2) AC systems with air handler's, condenser and insulated ductwork. Install ducting for bath fans, kitchen hood and dryer. COMPLIANT | Brookline Town | $63,000 |
| Oct 16, 2024 | Residential Mechanical - Sheet Metal | 61 HEATH ST Install two (2) Mitsubishi condensers with four associated indoor air handler, necessary insulated ductwork, air exchanger, bath, stove and dryer ve | Brookline Town | $103,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed19
- Issued16
- Not stated5
- Completed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- NEEDHAM MECHANICAL SYSTEMS
- NEEDHAM MECHANICAL
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.