Contractor · Electrical
Kevin Weber
41 building permits since 2018 in Providence city, RI; Marlborough city, MA and Middletown town, RI, across 7 counties — $9,598,498 in reported job value over 39 permits that state one.
- Building permits
- 41
- Reported job value
- $9.6M
- Active
- 2018–2026
- Latest permit
- Oct 7, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI11
- Marlborough city, MA8
- Middletown town, RI6
- Newport city, RI5
- Warwick city, RI4
- Barrington town, RI2
- Cranston city, RI2
- Dartmouth town, MA1
- Middleborough town, MA1
- Smithfield town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 3 |
| 2019 | 2 |
| 2020 | 1 |
| 2021 | 3 |
| 2022 | 6 |
| 2023 | 10 |
| 2024 | 6 |
| 2025 | 2 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical36
- Demolition7
- HVAC6
- Additions4
- Generators4
- Remodels2
- Accessory dwelling units1
- Kitchens1
- Bathrooms1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit28
- Electrical Permit - Commercial6
- Fire Alarm Permit5
- 2) Electrical Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 7, 2026 | Electrical Permit | New Ground up construction for ASB addition - including new underground, generator, ATS's, switchboards, panelboards, interior and exterior lighting, branch pow | Warwick City | $90,000 |
| Oct 6, 2026 | Electrical Permit | Temp Service, This is currently under design with RI Energy so a SRE has not been issued yet and will update this permit when its provided. 3phase 400amp 208/12 | Barrington Town | $5,000 |
| Jun 29, 2026 | Electrical Permit | This project consists of a new addition to an existing building and includes demolition, temporary lighting and power, and installation of a new electrical serv | Barrington Town | $100,000 |
| Jun 2, 2026 | Electrical Permit | Work is located within an existing hospital and includes areas identified on the drawings as MRI, Staff Lounge, Emergency Department, and Behavioral Health (BH) | Warwick City | $25,000 |
| May 6, 2026 | Electrical Permit | Work is located within an existing hospital called out as the Cath Lab. The scope of work includes selective demolition; installation of temporary power and lig | Warwick City | $10,000 |
| Apr 14, 2026 | Electrical Permit | New Ground up construction for the Maintenance Building - including new underground, ATS’s, panelboards, interior and exterior lighting, branch power, fire alar | Warwick City | $15,000 |
| Mar 26, 2026 | 2) Electrical Permit | New lighting, Fire Alarm additions to the existing system; Tele Data and AV raceways, panel boards fed from existing panels, and branch power throughout | Cranston City | $750,000 |
| Mar 11, 2026 | Electrical Permit | Installing Temp Power and Lighting throughout the house. | Newport City | $25,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed29
- Active10
- Issued1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.