Contractor · General building

Earl Myers

41 building permits since 2013 in Orleans Parish, LA.

Building permits
41
Reported job value
—
Active
2013–2026
Latest permit
Oct 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA41

Permits by year

By issue date (application date where there is none).

048
7
201420162020202220242026*
* 2026 is year to date.
View as table
YearPermits
20135
20145
20154
20161
20181
20202
20214
20223
20231
20242
20256
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical23
  • HVAC15
  • Plumbing14
  • Remodels13
  • New construction8
  • Windows & doors7
  • Demolition6
  • Roofing5
  • Bathrooms3
  • Kitchens1

Permit types

As the building departments classify them.

  • New Construction7
  • Renovation (Non-Structural)3
  • Renovation (Structural)2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2026—Request permission to demolish an existing six (6) unit apartment building. This building is not structurally sound and would be too costly to renovate. The sitOrleans Parish—
Aug 11, 2026—Renovation to an existing two family dwelling including the reconfiguration of the unit floor plans to include (1) 3-bedroom, 3 bath unit and (1) 2-bedroom2.5-bOrleans Parish—
Aug 5, 2026—Remove all site debris and haul to legal dump facility. Jack & level existing structure within 1/2" max. Replace finish flooring, minimal insulation & drywall. Orleans Parish—
Jun 5, 2026—Complete residential demolition. Open to incorporate vacant land with existing land at the New Orleans Country Club site. New fencing will be installed to matchOrleans Parish—
Jun 5, 2026—The New Orleans Country Club request to demolish this existing dwelling and incorporate the vacant land with their property. The vacant lot will be chain link fOrleans Parish—
May 27, 2026—Electrical six (6) month vacancy filing has been successfully inspected and completed. This filing pertains to electrical meter release and occupancy certificatOrleans Parish—
Mar 9, 2026—Renovate existing dwelling as per plans. Work to include demo, concrete/foundation, steel, framing, plumbing, electrical, insulation, drywall, carpentry, paintiOrleans Parish—
Nov 7, 2025—2724 side of double ONLY: Newly Purchased Residence - Electrical six month (6) vacancy request, update plumbing and AC/Heating system, interior painting, cabineOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued27
  • C/o issued8
  • Finaled3
  • Closed2
  • Void1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.