Contractor · Electrical
CC CONCRETE
41 building permits since 2017 in Minneapolis city, MN — $133,126 in reported job value over 41 permits that state one.
- Building permits
- 41
- Reported job value
- $133.1K
- Active
- 2017–2026
- Latest permit
- Jul 31, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN41
Permits by year
By issue date (application date where there is none).
048
8
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 6 |
| 2018 | 8 |
| 2019 | 5 |
| 2020 | 7 |
| 2021 | 5 |
| 2022 | 2 |
| 2023 | 5 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical5
- Demolition4
- HVAC3
- Plumbing3
- Windows & doors1
Permit types
As the building departments classify them.
- Res41
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 31, 2026 | Res | CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 O | Minneapolis City | $4,200 |
| Oct 6, 2025 | Res | REMOVE AND REPLACE CONCRETE LANDING (2 NEW 8" PIER FOOTINGS) AND STEPS (3 RISERS, 12" TREADS) AT FRONT DOOR OF SFD. Building Code: 2020 MN RESIDENTIAL CODE/MN R | Minneapolis City | $4,400 |
| Feb 14, 2024 | Res | REPLACE STOOP AND SINGLE STEP ON SIDE OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM TREAD ALLOWED FROST FOOTING D | Minneapolis City | $1,105 |
| May 31, 2023 | Res | (DMH - ProjectDox) RECONSTRUCT CONCRETE LANDING & STEPS AT FRONT OF SFD OVER NEW PIER FOOTINGS/FOUNDATION. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSP | Minneapolis City | $4,240 |
| May 25, 2023 | Res | REPLACE FRONT STOOP AND STEPS (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, P | Minneapolis City | $4,035 |
| May 11, 2023 | Res | (DMH - ProjectDox) RECONSTRUCT CONCRETE LANDING & STEPS AT FRONT OF SFD OVER NEW PIER FOOTINGS/FOUNDATION. Grippable handrail height 34-38 above nose of tread r | Minneapolis City | $4,350 |
| Apr 24, 2023 | Res | REPLACE STOOP AND STEPS ON REAR OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISE | Minneapolis City | $4,905 |
| Mar 6, 2023 | Res | Replace Rear Steps Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Stairs: 7 3/4 maximum riser height, 10 minimum tread depth. Guar | Minneapolis City | $3,750 |
Permit status
Where its permits stand, as the departments report them.
- Closed40
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.