Contractor · Electrical
SUNUSO ENERGY
42 building permits since 2013 in Los Angeles city, CA; Riverside city, CA and Norwalk city, CA, across 2 counties — $174,153 in reported job value over 10 permits that state one.
- Building permits
- 42
- Reported job value
- $174.2K
- Active
- 2013–2020
- Latest permit
- Nov 18, 2020
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA26
- Riverside city, CA10
- Norwalk city, CA6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 3 |
| 2018 | 12 |
| 2019 | 20 |
| 2020 | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical30
- Solar15
- Roofing8
- Plumbing3
- Battery storage2
- Electric meters2
Permit types
As the building departments classify them.
- Electrical23
- BRES8
- Plumbing3
- Residential2
- Solar Panel2
- Electrical Commercial solar panel1
- Electrical Residential solar panel1
- Residential Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 18, 2020 | Electrical | — | Los Angeles City | — |
| Nov 18, 2020 | Plumbing | — | Los Angeles City | — |
| Aug 11, 2020 | Electrical | — | Los Angeles City | — |
| Jul 1, 2020 | Electrical | PV1. Installation of 10.85 kW DC roof mounted PV system. (35) module | Los Angeles City | — |
| Feb 6, 2020 | Solar Panel | NEW PHOTOVOLTAIC 7.20KW SYSTEM: (24) CSUN 300W SOLAR MODULES, (1) SOLAREDGE SE6000H-US INVERTER, (24) SOLAR EDGE P320 POWER OPTIMIZERS (NOTE EXISTING 200 AMP SE | Norwalk City | — |
| Jan 28, 2020 | Electrical Residential solar panel | MISCELLANEOUS CONDUIT & CONDUCTORS FOR NEW PHOTOVOLTAIC 7.20KW SYSTEM PC#20010083 | Norwalk City | — |
| Jan 13, 2020 | Solar Panel - Residential & PC | PC: NEW PHOTOVOLTAIC SYSTEM: 24 MODULES, 7.2KW SYSTEM, 1 SOLAREDGE INVERTER. (NOTE EXISTING 200 AMP SERVICE PANEL AND NO BATTERY BACK-UP IS BEING PROPOSED). | Norwalk City | — |
| Dec 12, 2019 | Residential | INSTALL PV SOLAR SYSTEM WITH (17) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF 5.10 KW | Riverside City | $20,463 |
Permit status
Where its permits stand, as the departments report them.
- Not stated26
- Finaled9
- Completed7
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.