Contractor · Specialty (solar, fire, telecom)

SUN DIEGO SOLAR CONSTRUCTION LLC

42 building permits since 2017 in San Diego County, CA.

Building permits
42
Reported job value
—
Active
2017–2023
Latest permit
Oct 20, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA42

Permits by year

By issue date (application date where there is none).

07.515
13
201720182019202020212023
View as table
YearPermits
20172
20185
201910
20206
20216
202313

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar41
  • Electrical4
  • Battery storage3
  • Roofing1
  • New construction1

Permit types

As the building departments classify them.

  • Existing2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 20, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Oct 17, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Sep 8, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 30, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 3, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 21, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jun 30, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jun 26, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Issued13
  • Active12

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.