Contractor · Electrical

SPECTRA ELECTRICAL

42 building permits since 2007 in Mesa city, AZ and Phoenix city, AZ — $1,332,252 in reported job value over 12 permits that state one.

Building permits
42
Reported job value
$1.3M
Active
2007–2026
Latest permit
Jun 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ40
  • Phoenix city, AZ2

Permits by year

By issue date (application date where there is none).

048
7
201520172020202220242026*
* 2026 is year to date.
View as table
YearPermits
20071
20156
20167
20172
20184
20201
20211
20225
20235
20244
20254
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical24
  • HVAC6
  • Fire sprinklers4
  • Roofing2
  • EV chargers2
  • Gas1
  • Remodels1
  • Additions1
  • Demolition1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Commercial/Industrial Projects25
  • Com (OTH) -- Electrical6
  • Com (OTH) -- Non-Structural3
  • Svc (PSF) -- Sign Permits2
  • BLD1
  • Com (MSC) -- Annual Facilities Permit1
  • Com (OTH) -- Renovations/Remodels1
  • Com (OTH) -- Storage Shed/Barn1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 2, 2026Commercial/Industrial ProjectsAFP26-00653 THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A COMPACTOR W/ ROLL-OFF BIN IN THE EXISTING TRUCK DOCK OF DSSA / PH. II. EXIST. ELECTRICAL UTILITIES Mesa—
Dec 23, 2025Commercial/Industrial ProjectsTHE PROJECT SCOPE INCLUDES THE RELOCATION OF THE EXISTING "FINISHED GOODS STAGING" AREA (PREVIOUSLY PERMITTED IN COM#PMT21-00454) WITH THE FOLLOWING: 1. RECONFIMesa—
Nov 17, 2025Commercial/Industrial ProjectsTHE PROJECT SCOPE INCLUDES THE INSTALLATION OF A NEW ELECTRIC VEHICLE (E/V) CHARGING STATION IN THE PARKING LOT ON THE EAST SIDE OF THE PROPERTY EXIST. ELECTRICMesa—
May 21, 2025Commercial/Industrial ProjectsTHE PROJECT SCOPE INVOLVES THE TEMPORARY INSTALLATION OF A NEW “REACTANT DISPENSING STATION” (WITH SUPPORT EQUIPMENT FROM SURPLUS) INTO THE EXISTING “LOAD ROOM”Mesa—
Jan 24, 2025Commercial/Industrial ProjectsTHE PROJECT SCOPE INVOLVES REMOVING THE EXISTING 'UPS' SYSTEM IN BLDG. 1. EXISTING ELECTRICAL UTILITIES WILL BE MODIFIED TO ACCOMMODATE THE REMOVAL.Mesa—
Dec 23, 2024Commercial/Industrial ProjectsTHE PROJECT SCOPE INVOLVES THE FOLLOWING: · INSTALLATION OF THE NEW '2A15' LOADING / ASSEMBLY EQUIPMENT IN THE EXISTING SOUTHEAST LOAD ROOM · TRANSFER EXISTING Mesa—
May 28, 2024Commercial/Industrial ProjectsTHE PROJECT SCOPE INCLUDES REMOVING (2) EXISTING PRESSES AND THE INSTALLATION OF (2) PRESSES (FROM SURPLUS) IN THE PH. I / PROTOTYPE LAB.  EXIST. ELECTRICAL UTIMesa—
Apr 17, 2024Commercial/Industrial ProjectsTHE PROJECT SCOPE INCLUDES THE INSTALLATION OF (10) NEW 'PRECITEC' LASER WELDING MONITOR STATIONS IN THE PH. I and II PRODUCTION AREAS.  EXIST. ELECTRICAL UTILIMesa—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued24
  • Finaled14
  • Issued2
  • Completed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.