Contractor · Specialty (solar, fire, telecom)
NATIONWIDE SUN
42 building permits since 2021 in Davis city, CA; Mountain View city, CA and Elk Grove city, CA, across 9 counties — $503,926 in reported job value over 34 permits that state one.
- Building permits
- 42
- Reported job value
- $503.9K
- Active
- 2021–2026
- Latest permit
- Mar 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Davis city, CA13
- Mountain View city, CA9
- Elk Grove city, CA5
- Sacramento County, CA3
- Camarillo city, CA2
- Menlo Park city, CA2
- Oakland city, CA2
- San Pablo city, CA2
- Placer County, CA1
- Citrus Heights city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 3 |
| 2022 | 7 |
| 2023 | 13 |
| 2024 | 8 |
| 2025 | 6 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar28
- Electrical15
- Battery storage5
- EV chargers5
- Remodels2
- Grading & excavation1
- Generators1
- Electric meters1
Permit types
As the building departments classify them.
- PHOTOVALTIC RESIDENTIAL10
- BL, CH, EL9
- Electrical6
- ELECTRIC RESIDENTIAL3
- ELECTRICAL2
- ELECTRICAL/ALTERATION2
- ONLINE SOLAR PHOTOVOLTAIC PERMITS2
- RESIDENTIAL ROOFTOP SOLAR SYSTEM2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 26, 2026 | Electrical | Install a 200a span panel main 40 flush mount at hall near laundry area. Relocate home loads from msp and (e) sub panel to the (n) span panel. Install a (n) 100 | Oakland City | — |
| Mar 9, 2026 | Electrical | Install a 4.46kw pv system for a single family residence consisting of (11) longi solar 405w modules, (11) enphase iq8ac microinverters and (1) enphase combiner | Menlo Park City | — |
| Feb 25, 2026 | Electrical | Installation of a 6.56kw pv system consisting of (16) maxeon 410w modules, (16) iq8ac micro inverters and (1) enphase combiner 5c with iq gateway to a single fa | Menlo Park City | — |
| Feb 19, 2026 | Electrical | Install a 70a span smart home panel in replace of the 70a subpanel in hallway. | Oakland City | — |
| Feb 11, 2026 | Electrical | R/m solar & ess + ev charger ***existing solar permitted with bld21-07609**** (n) modules: (6) hanwha qcells qpeak duo blk ml-g10+ 410w (n) microinverters: (6) | Placer County | — |
| Aug 27, 2025 | PHOTOVALTIC RESIDENTIAL | 12 PAN 5.04KW PV/10KW ESS | Davis City | $20,982 |
| Jul 30, 2025 | ELECTRICAL/ALTERATION | Install Emporia pro level 2 Ev charger with Nema 14-50 | San Pablo City | $1,247 |
| Jul 9, 2025 | ONLINE SOLAR PHOTOVOLTAIC PERMITS | Install 4.0kW PV expansion and 5kWh of battery storage | Elk Grove City | $12,200 |
Permit status
Where its permits stand, as the departments report them.
- Completed15
- Not stated10
- Finaled8
- Closed5
- Active2
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.