Contractor · Specialty (solar, fire, telecom)

NATIONWIDE SUN

42 building permits since 2021 in Davis city, CA; Mountain View city, CA and Elk Grove city, CA, across 9 counties — $503,926 in reported job value over 34 permits that state one.

Building permits
42
Reported job value
$503.9K
Active
2021–2026
Latest permit
Mar 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Davis city, CA13
  • Mountain View city, CA9
  • Elk Grove city, CA5
  • Sacramento County, CA3
  • Camarillo city, CA2
  • Menlo Park city, CA2
  • Oakland city, CA2
  • San Pablo city, CA2
  • Placer County, CA1
  • Citrus Heights city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20213
20227
202313
20248
20256
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar28
  • Electrical15
  • Battery storage5
  • EV chargers5
  • Remodels2
  • Grading & excavation1
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • PHOTOVALTIC RESIDENTIAL10
  • BL, CH, EL9
  • Electrical6
  • ELECTRIC RESIDENTIAL3
  • ELECTRICAL2
  • ELECTRICAL/ALTERATION2
  • ONLINE SOLAR PHOTOVOLTAIC PERMITS2
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 26, 2026ElectricalInstall a 200a span panel main 40 flush mount at hall near laundry area. Relocate home loads from msp and (e) sub panel to the (n) span panel. Install a (n) 100Oakland City—
Mar 9, 2026ElectricalInstall a 4.46kw pv system for a single family residence consisting of (11) longi solar 405w modules, (11) enphase iq8ac microinverters and (1) enphase combinerMenlo Park City—
Feb 25, 2026ElectricalInstallation of a 6.56kw pv system consisting of (16) maxeon 410w modules, (16) iq8ac micro inverters and (1) enphase combiner 5c with iq gateway to a single faMenlo Park City—
Feb 19, 2026ElectricalInstall a 70a span smart home panel in replace of the 70a subpanel in hallway.Oakland City—
Feb 11, 2026ElectricalR/m solar & ess + ev charger ***existing solar permitted with bld21-07609**** (n) modules: (6) hanwha qcells qpeak duo blk ml-g10+ 410w (n) microinverters: (6) Placer County—
Aug 27, 2025PHOTOVALTIC RESIDENTIAL12 PAN 5.04KW PV/10KW ESSDavis City$20,982
Jul 30, 2025ELECTRICAL/ALTERATIONInstall Emporia pro level 2 Ev charger with Nema 14-50San Pablo City$1,247
Jul 9, 2025ONLINE SOLAR PHOTOVOLTAIC PERMITSInstall 4.0kW PV expansion and 5kWh of battery storageElk Grove City$12,200

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Not stated10
  • Finaled8
  • Closed5
  • Active2
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.