Contractor · Specialty (solar, fire, telecom)

AIR SUN INC

42 building permits since 2013 in Madera city, CA; Merced city, CA and Kings County, CA, across 4 counties — $264,530 in reported job value over 33 permits that state one.

Building permits
42
Reported job value
$264.5K
Active
2013–2026
Latest permit
Sep 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Madera city, CA18
  • Merced city, CA15
  • Kings County, CA5
  • Clovis city, CA4

Permits by year

By issue date (application date where there is none).

01020
17
20132017202220242026*
* 2026 is year to date.
View as table
YearPermits
20131
20141
20172
20212
20228
202317
20243
20251
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar40
  • Roofing15
  • HVAC14
  • Plumbing14
  • Battery storage8
  • Electrical6
  • EV chargers1
  • Windows & doors1
  • New construction1

Permit types

As the building departments classify them.

  • PHOTOVOLTAIC SYSTEMS12
  • RESPV P/C10
  • RESPVSOLAR7
  • 340-R5
  • Electrical4
  • Solar2
  • MWRE1
  • SolarAPP1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 18, 2026MWRERES EV CHARGER LEVEL 2Madera City$2,200
Aug 26, 2026SolarAPP*Installing 25 modules 10.750 kWDC and a Tesla powerwall 3 with and expansion 27kWACMerced City$18,000
Jul 9, 2026SolarInstalling 9.460kW of Photovoltaic and 27kWh of Tesla Storage System. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - DO NOT COVER MECHANICAL OMerced City$18,000
Feb 13, 2026ElectricalInstalling 10.660kw of grid-tied photovoltaic system and 27kwh of tesla energy storage system.Clovis City—
Feb 13, 2026ElectricalInstall 10.66kw, roof mount, pv system w/ (26) modules with mid-circuit interrupter rsds, a 13.5kwh powerwall 3 ess with pcs enabled & a 13.5kwh powerwall 3 expClovis City—
Feb 4, 2026ElectricalInstalling new 17.630kw of grid-tied photovoltaic system and new 27khw of tesla energy storage system.Clovis City—
Feb 4, 2026ElectricalInstalling new 17.630kw of grid-tied photovoltaic system and new 27khw of tesla energy storage system. 60a pv breakerClovis City—
Sep 16, 2025Solar(18) roof mounted 410W DC panels 13.5kWh ESS. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - DO NOT COVER MECHANICAL OR PLUMBING VENTS WITH SOMerced City$5,000

Permit status

Where its permits stand, as the departments report them.

  • Issued32
  • Not stated5
  • Active2
  • Finaled2
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.