Contractor · General building

OLEARY PLUMBING & HEATING INC

43 building permits since 2019 in Mukwonago village, WI; Waukesha County, WI and Genesee town, WI, across 3 counties.

Building permits
43
Reported job value
—
Active
2019–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mukwonago village, WI27
  • Waukesha County, WI7
  • Genesee town, WI3
  • Walworth County, WI2
  • Vernon village, WI2
  • Racine County, WI1
  • East Troy village, WI1

Permits by year

By issue date (application date where there is none).

07.515
13
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20192
20206
20215
202213
20235
20245
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC21
  • Plumbing16
  • Bathrooms8
  • Additions7
  • Remodels5
  • Electrical3
  • Gas1
  • Grading & excavation1
  • Kitchens1
  • Demolition1

Permit types

As the building departments classify them.

  • Plumbing16
  • HVAC Only10
  • HVAC7
  • Electrical3
  • Heating Boiler3
  • Building drain vent sanitary2
  • Water distribution system2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026ElectricalInstall of two bath fans in separate bathrooms and install two GFCI protectors in kitchenMukwonago Village—
Jun 30, 2025Plumbing2nd Floor Bathroom Addition, Toilet, 2 sinks and shower.Mukwonago Village—
May 21, 2025PlumbingBreak, Remove and Replace concrete from sanitary crock area to new powder room and under the stairs for bar sink drain relocate existing floor drain provide andMukwonago Village—
Mar 26, 2025HVACMisc. duct workMukwonago Village—
Aug 13, 2024ElectricalTRENCH 4-6” DEEP AROUND PERIMETER OF POOL 18” OUT FROM POOL WALLMukwonago Village—
Apr 15, 2024PlumbingReplace Tailpiece Extention on bath lav.Mukwonago Village—
Mar 26, 2024PlumbingPlumbing RemodelMukwonago Village—
Feb 6, 2024HVACDuct work modifications and installation of bath fan ventingMukwonago Village—

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • Approved10
  • Documents submitted7
  • Closed2
  • Expired2
  • Issued1
  • Cancelled1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.