Contractor · General building
KEVIN CORISTINE
43 building permits since 2017 in Newport city, RI; Middletown town, RI and Portsmouth town, RI, across 3 counties — $6,141,967 in reported job value over 42 permits that state one.
- Building permits
- 43
- Reported job value
- $6.1M
- Active
- 2017–2026
- Latest permit
- Jun 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Newport city, RI33
- Middletown town, RI5
- Portsmouth town, RI2
- East Greenwich town, RI1
- Tiverton town, RI1
- South Kingstown town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 7 |
| 2018 | 2 |
| 2019 | 1 |
| 2020 | 4 |
| 2021 | 6 |
| 2022 | 7 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 9 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels23
- Bathrooms20
- Windows & doors18
- Kitchens10
- Roofing10
- Plumbing7
- Additions4
- Demolition2
- New construction2
- Electrical1
Permit types
As the building departments classify them.
- Building Permit41
- Demolition Permit1
- EG Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 15, 2026 | Building Permit | Remodel second floor bathroom. New bathtub with tile walls. New toilet. New vanity countertop. Tile the floor install new wood new trim. Lightly remodel kitchen | Portsmouth Town | $35,000 |
| Apr 30, 2026 | Building Permit | Major renovation of the house. The roof is to be removed and a 3rd floor added. As per the plans that will be submitted. We have a height variance that is forma | Newport City | $450,000 |
| Mar 11, 2026 | EG Building Permit | Remodel existing bathroom. New tile shower, new soaking tub,new vanity,new toilet, new tile floor. All fixtures are going the same location just being updated. | East Greenwich Town | $35,000 |
| Jan 9, 2026 | Building Permit | Remove all drywall, insulation and flooring to the subfloor. We will be doing a more extensive remodel and applying for an additional permit after we determine | Newport City | $20,000 |
| Nov 7, 2025 | Building Permit | Remodel bathroom on the third floor. Swap the location of the existing shower and entry door. Toilet and vanity are to stay in same location. Tile shower walls, | Newport City | $17,000 |
| Oct 25, 2025 | Building Permit | Replace the wood decking on the front porch and the trim that wraps around it With a composite decking. No new framing or structural changes to be made. 1 windo | Middletown Town | $14,250 |
| Oct 22, 2025 | Building Permit | Enlarge the size of the window in one of the south facing bedroom on the back of the house to 95"x 60" | Portsmouth Town | $9,990 |
| Oct 16, 2025 | Building Permit | New Roof with like kind asphalt shingels. All new windows and doors. The installation of an egress window well on the east side of the house and egress window i | Newport City | $107,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed30
- Active13
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.