Contractor · Electrical
ICON POWER LLC
43 building permits since 2020 in Mesa city, AZ; Peoria city, AZ and Phoenix city, AZ — $794,544 in reported job value over 41 permits that state one.
- Building permits
- 43
- Reported job value
- $794.5K
- Active
- 2020–2026
- Latest permit
- Jul 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ41
- Peoria city, AZ1
- Phoenix city, AZ1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 5 |
| 2021 | 4 |
| 2022 | 8 |
| 2023 | 4 |
| 2024 | 9 |
| 2025 | 8 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical41
- Solar40
- Battery storage37
- Electric meters12
- Additions2
- Generators2
Permit types
As the building departments classify them.
- Electrical40
- Other Commercial1
- Residential1
- SE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 30, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’ | Mesa | $10,400 |
| Jul 8, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,400 |
| Apr 13, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND TESLA POWERWALL3 EPANSION UNIT. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 P | Mesa | $18,400 |
| Mar 18, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $10,400 |
| Nov 25, 2025 | Other Commercial | Electrical only permit. Solar install is under 10,000 SF. Installation of a 41.82kW PV System with a Tesla PowerWall3, with (3) meters and batteries. Results in | Mesa | $12,900 |
| Oct 31, 2025 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLINWH BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2 | Mesa | $15,500 |
| Sep 25, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $9,900 |
| Sep 9, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UT | Mesa | $18,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued41
- Active1
- Finaled1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.