Contractor · Specialty (solar, fire, telecom)
ENERGY SERVICES PARTNERS INC. DBA ESP CONTRA
43 building permits since 2019 in Redlands city, CA.
- Building permits
- 43
- Reported job value
- —
- Active
- 2019–2021
- Latest permit
- Dec 29, 2021
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Redlands city, CA43
Permits by year
By issue date (application date where there is none).
02040
39
201920202021
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 39 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar38
- Electrical24
- EV chargers2
- Roofing1
Permit types
As the building departments classify them.
- B-BSP Solar35
- B-REV Plan Revisions8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 29, 2021 | B-BSP Solar | RESIDENTIAL : ROOF MOUNT PV 13.64 KW SOLAR 31 MODULES, 31 OPTIMIZERS MSP MAIN BREAKER DERATE FROM 200 TO 175A | Redlands City | — |
| Dec 29, 2021 | B-REV Plan Revisions | RESIDENTIAL: REVISION TO B21-02237 (MODULE LAYOUT CHANGE) | Redlands City | — |
| Dec 7, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL 16 PV MODULES 6.24 KW 1 INVERTER MPU: 200A | Redlands City | — |
| Nov 19, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL (16) ROOFTOP PHOTOVOLTAIC (5.68 KW) WITH (1) INVERTER AND (16) OPTIMIZERS. UPGRADE THE MAIN ELECTRICAL PANEL TO 225 AMP WITH 200 AMP MAIN B | Redlands City | — |
| Nov 18, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL (20) ROOFTOP PHOTOVOLTAIC (7.10 KW) PANELS** REV21-00138 TO DECREASE PV SYSTEM SIZE TO 4.97kwdc, (14) MODULES & MODULE TYPE **REV21-00157 T | Redlands City | — |
| Nov 16, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL (36) ROOFTOP PHOTOVOLTAIC (12.78 KW) WITH (36) OPTIMIZERS & (1) INVERTER. UPGRADE THE MAIN ELECTRICAL PANEL: 225 AMP BUSBAR & 200 AMP MAIN | Redlands City | — |
| Nov 15, 2021 | B-BSP Solar | RESIDENTIAL: (N) 3.195kwdc PV SOLAR (ROOF MOUNTED), (9) MODULES* PV SYSTEM TO BE INSTALLED ON DETACHED GARAGE **REV21-00153 TO RELOCATE EQUIPMENT LOCATION** | Redlands City | — |
| Nov 9, 2021 | B-BSP Solar | RESIDENTIAL: (N) 8.8kwdc PV SOLAR (ROOF MOUNTED), (20) MODULES, (N) 225A/200A MAIN PANEL UPGRADE **REV21-00155 FOR MODULE LAYOUT CHANGE** | Redlands City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled30
- Issued7
- Documents submitted3
- Approved2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.