ENERGY SERVICES PARTNERS INC. DBA ESP CONTRA

43 building permits since 2019 in Redlands city, CA.

Building permits
43
Reported job value
—
Active
2019–2021
Latest permit
Dec 29, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Redlands city, CA43

Permits by year

By issue date (application date where there is none).

02040
39
201920202021
View as table
YearPermits
20191
20202
202139

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar38
  • Electrical24
  • EV chargers2
  • Roofing1

Permit types

As the building departments classify them.

  • B-BSP Solar35
  • B-REV Plan Revisions8

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 29, 2021B-BSP SolarRESIDENTIAL : ROOF MOUNT PV 13.64 KW SOLAR 31 MODULES, 31 OPTIMIZERS MSP MAIN BREAKER DERATE FROM 200 TO 175ARedlands City—
Dec 29, 2021B-REV Plan RevisionsRESIDENTIAL: REVISION TO B21-02237 (MODULE LAYOUT CHANGE)Redlands City—
Dec 7, 2021B-BSP SolarRESIDENTIAL: INSTALL 16 PV MODULES 6.24 KW 1 INVERTER MPU: 200ARedlands City—
Nov 19, 2021B-BSP SolarRESIDENTIAL: INSTALL (16) ROOFTOP PHOTOVOLTAIC (5.68 KW) WITH (1) INVERTER AND (16) OPTIMIZERS. UPGRADE THE MAIN ELECTRICAL PANEL TO 225 AMP WITH 200 AMP MAIN BRedlands City—
Nov 18, 2021B-BSP SolarRESIDENTIAL: INSTALL (20) ROOFTOP PHOTOVOLTAIC (7.10 KW) PANELS** REV21-00138 TO DECREASE PV SYSTEM SIZE TO 4.97kwdc, (14) MODULES & MODULE TYPE **REV21-00157 TRedlands City—
Nov 16, 2021B-BSP SolarRESIDENTIAL: INSTALL (36) ROOFTOP PHOTOVOLTAIC (12.78 KW) WITH (36) OPTIMIZERS & (1) INVERTER. UPGRADE THE MAIN ELECTRICAL PANEL: 225 AMP BUSBAR & 200 AMP MAIN Redlands City—
Nov 15, 2021B-BSP SolarRESIDENTIAL: (N) 3.195kwdc PV SOLAR (ROOF MOUNTED), (9) MODULES* PV SYSTEM TO BE INSTALLED ON DETACHED GARAGE **REV21-00153 TO RELOCATE EQUIPMENT LOCATION**Redlands City—
Nov 9, 2021B-BSP SolarRESIDENTIAL: (N) 8.8kwdc PV SOLAR (ROOF MOUNTED), (20) MODULES, (N) 225A/200A MAIN PANEL UPGRADE **REV21-00155 FOR MODULE LAYOUT CHANGE**Redlands City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled30
  • Issued7
  • Documents submitted3
  • Approved2
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.