Contractor · Electrical
David George Aiken
43 building permits since 2018 in Mesa city, AZ.
- Building permits
- 43
- Reported job value
- —
- Active
- 2018–2020
- Latest permit
- Aug 6, 2020
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Mesa city, AZ43
Permits by year
By issue date (application date where there is none).
02040
31
201820192020
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 8 |
| 2019 | 31 |
| 2020 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical18
- HVAC8
- Demolition4
- Roofing2
- Additions1
- Windows & doors1
Permit types
As the building departments classify them.
- Commercial/Industrial Projects42
- Other Commercial1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 6, 2020 | Commercial/Industrial Projects | The project scope includes the removal and relocation of existing misc. assembly equipment from Bldg. 3 to Bldg. 2 for the use in the new Phase Breaker assembly | Mesa | — |
| Feb 27, 2020 | Commercial/Industrial Projects | The project scope includes the rearrangement of Robo 1,2,3 Welders and Nissei #4 Mold Machine, and ancillary equipment. This project is preformed on existing bu | Mesa | — |
| Jan 30, 2020 | Commercial/Industrial Projects | The project scope includes the partial demo of existing storage racking in Building 1, Area A.2 Warehouse. This project is preformed on existing building, struc | Mesa | — |
| Jan 30, 2020 | Commercial/Industrial Projects | The project scope includes the demo of existing equipment from Phase I, Area B Production. This project is preformed on existing building, structure and utiliti | Mesa | — |
| Dec 23, 2019 | Commercial/Industrial Projects | The project scope consists of the installation of (4) four pass-through fixtures on the Phase II Production Building per #BLD2015-07041. Existing hazardous mate | Mesa | — |
| Dec 19, 2019 | Commercial/Industrial Projects | The project scope includes the installation of two (2) pull stations and two (2) Horn/Strobe Relocation | Mesa | — |
| Dec 12, 2019 | Commercial/Industrial Projects | The project scope includes installing utilities to new O-Ring and Re-Label Machine in Phase II's Production Area. This project is preformed on existing building | Mesa | — |
| Nov 19, 2019 | Commercial/Industrial Projects | The project scope includes installing utilities to LE- A8 Subline in Phase I - Production and installing utilities to Hydropac within the 'LE' Expansion. This p | Mesa | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued40
- Issued3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.