Contractor · Electrical

CROCKER ELECTRICAL CO INC

43 building permits since 2009 in Brookline town, MA; Rockland town, MA and Westford town, MA, across 3 counties — $10,500 in reported job value over 4 permits that state one.

Building permits
43
Reported job value
$10.5K
Active
2009–2026
Latest permit
May 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brookline town, MA37
  • Rockland town, MA3
  • Westford town, MA1
  • Quincy city, MA1
  • Hingham town, MA1

Permits by year

By issue date (application date where there is none).

0510
10
20092016202220242026*
* 2026 is year to date.
View as table
YearPermits
20091
20151
20161
20218
202210
202310
20243
20256
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical43
  • HVAC9
  • Demolition9
  • Bathrooms8
  • Kitchens7
  • Gas2
  • Battery storage1
  • Roofing1
  • Plumbing1
  • Generators1

Permit types

As the building departments classify them.

  • Commercial Electrical33
  • ELECT.4
  • Residential Electrical4
  • Electrical Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 14, 2026Commercial ElectricalWilliam Aufiero Install (4) Variable Frequency Drives in the boiler room. Remove old pipes, wires, and replace with new for cooling towers on the roof.Brookline Town—
May 12, 2026Commercial ElectricalWilliam Aufiero Remove existing ceiling devices including lighting, install temporary lights, duplex receptacles on the wall and install new lights in the basemBrookline Town—
Jan 13, 2026Commercial ElectricalWilliam Aufiero Install lights fixtures, receptacles, and exit signs on 1st floor corridor.Brookline Town—
Aug 14, 2025Commercial ElectricalWilliam Aufiero Add new fire alarm devices and relocate speaker strobes.Brookline Town—
Aug 12, 2025Commercial ElectricalWilliam Aufiero Remove old fixtures, switches, receptacles in the lobby and corridor. Replace with new LED fixtures, and receptacles. Rework existing circuits aBrookline Town—
Jul 17, 2025Residential ElectricalWilliam Aufiero Install new 80A feeder from main service inside dwelling to rear of garage for air conditioning.Brookline Town—
Jun 3, 2025Residential ElectricalWilliam Aufiero Install new call boxes via underground PVC conduits from the building. Wire new call box pole and panel. Demo and make safe old circuit. InstallBrookline Town—
May 13, 2025Commercial Electricalwilliam Aufiero Lower 2 heat detector to new ceiling secure 3 speakers to new wallsBrookline Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed36
  • Issued6
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.