Contractor · Plumbing
WESTERN MECHANICAL CONTRACTORS
44 building permits since 2010 in Tacoma city, WA; Auburn city, WA and Marysville city, WA, across 4 counties — $984,447 in reported job value over 28 permits that state one.
- Building permits
- 44
- Reported job value
- $984.4K
- Active
- 2010–2026
- Latest permit
- Aug 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tacoma city, WA28
- Auburn city, WA13
- Marysville city, WA2
- Bellingham city, WA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 1 |
| 2011 | 3 |
| 2012 | 3 |
| 2013 | 1 |
| 2014 | 6 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 3 |
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 4 |
| 2022 | 1 |
| 2023 | 8 |
| 2024 | 1 |
| 2025 | 5 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing33
- Water heaters9
- HVAC8
- Bathrooms8
- Gas7
- Kitchens5
- Electrical5
- Demolition4
- Remodels3
- Grading & excavation1
Permit types
As the building departments classify them.
- Building27
- MECHANICAL2
- FIRE1
- Utility Connection1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 11, 2026 | Building | Drain, disconnect, remove, and dispose of the existing A.O. Smith HPTU-66N-120 Hybrid Heat Pump Water Heater. Furnish and install a new A.O. Smith HPTU-66N-120 | Tacoma City | $12,824 |
| Jun 2, 2026 | Building | • Disconnect the ½” backflow assembly, water and drain from the existing proofer. • Reinstall the existing backflow and cold-water supply on the new proofer onc | Tacoma City | $6,556 |
| Mar 10, 2026 | Building | Replacing Water Heater on Main Floor. Current Tank is a GE Model GE40M06AAG / s/n GE 0207R02793. NEW tank will be a Rheem ProE_CG | Tacoma City | $2,100 |
| Dec 17, 2025 | Building | Plumbing Work at PROFESSIONAL SERVICES- Commercial | Tacoma City | $178,830 |
| Nov 5, 2025 | Building | • Disconnect the existing West Restrooms plumbing fixtures. Cap the water to the space to allow demo by others. • Furnish and install new rough plumbing for the | Tacoma City | $80,822 |
| Oct 24, 2025 | Building | • Demo and temporarily or permanently cap the existing plumbing as shown in the provided drawings. • Modify the existing rough plumbing for the new plumbing fix | Tacoma City | $39,206 |
| Oct 20, 2025 | Building | • Cut open the existing 4” waste in the basement and utilize a sewer camera to determine the condition and depth. Provide a report on the findings. • Assist wit | Tacoma City | $76,292 |
| Oct 16, 2025 | Building | • Assist with the layout for demo by others to facilitate plumbing installation. • Furnish and install 1 new cold-water header with a new 1” Watts LF007 double | Tacoma City | $66,458 |
Permit status
Where its permits stand, as the departments report them.
- Finaled33
- Issued6
- Expired2
- Cancelled2
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.