Contractor · Electrical
AMECO SOLAR LLC
473 building permits since 2013 in Los Angeles city, CA; Norwalk city, CA and Riverside city, CA, across 13 counties — $803,437 in reported job value over 47 permits that state one.
- Building permits
- 473
- Reported job value
- $803.4K
- Active
- 2013–2026
- Latest permit
- Sep 17, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA327
- Norwalk city, CA21
- Riverside city, CA19
- Camarillo city, CA15
- Burbank city, CA12
- Mountain View city, CA9
- Oceanside city, CA9
- Garden Grove city, CA6
- San Jose city, CA5
- Contra Costa County, CA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 8 |
| 2014 | 10 |
| 2015 | 13 |
| 2016 | 14 |
| 2017 | 2 |
| 2018 | 2 |
| 2019 | 26 |
| 2020 | 22 |
| 2021 | 65 |
| 2022 | 144 |
| 2023 | 70 |
| 2024 | 12 |
| 2025 | 19 |
| 2026 (YTD) | 59 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical394
- Solar153
- Battery storage42
- Roofing28
- Electric meters10
- Plumbing9
- EV chargers7
- Accessory dwelling units2
- Additions2
- Water heaters1
Permit types
As the building departments classify them.
- Electrical366
- Residential19
- RESIDENTIAL ROOFTOP SOLAR SYSTEM13
- Solar Panel10
- Plumbing8
- BL, CH, EL6
- Residential Electrical4
- Solar Panel - Residential & PC4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 17, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 9.68KW, (22) PANELS, AND 27.0KWH ENERGY STORAGE SYS FOR MAIN HOUSE | Garden Grove City | $34,000 |
| Sep 9, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 4.60KW, (10) PANELS, AND 13.5KWH ENERGY STORAGE SYS FOR ADU | Garden Grove City | $16,000 |
| Sep 8, 2026 | PHOTOVALTIC RESIDENTIAL | 19 PAN 8.74KW PV SYS ESS | Davis City | $30,000 |
| Aug 13, 2026 | ELECTRICAL | (1) GATEWAY CONTROLLER PANEL (... | Los Altos Hills Town | $2,000 |
| Aug 3, 2026 | E | Installation of a 50A EV Charger | Contra Costa County | $2,000 |
| Aug 3, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 5.52KW, (12) PANELS, AND 10.0KWH ENERGY STORAGE SYS FOR MAIN HOUSE | Garden Grove City | $28,000 |
| Jul 17, 2026 | SFD SOLAR PV - ENERGY STORAGE SYSTEM | Installation of a 3.22 kW Roof-Mounted Solar PV System | Oceanside City | — |
| Jun 29, 2026 | PVR | Installation of a 4.30 kW Roof-Mounted Solar PV System consisting of (10) Modules, (10) Micro-Inverters, (1) 125A Combiner Box, (1) 11.5 kW Tesla Powerwall ESS, | Contra Costa County | $32,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated339
- Finaled67
- Completed26
- Active19
- Issued10
- Additional information required5
- Reviews in progress4
- Closed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- AMECO SOLAR INC
- AMECO SOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.