Contractor · Electrical

AMECO SOLAR LLC

473 building permits since 2013 in Los Angeles city, CA; Norwalk city, CA and Riverside city, CA, across 13 counties — $803,437 in reported job value over 47 permits that state one.

Building permits
473
Reported job value
$803.4K
Active
2013–2026
Latest permit
Sep 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA327
  • Norwalk city, CA21
  • Riverside city, CA19
  • Camarillo city, CA15
  • Burbank city, CA12
  • Mountain View city, CA9
  • Oceanside city, CA9
  • Garden Grove city, CA6
  • San Jose city, CA5
  • Contra Costa County, CA4

Permits by year

By issue date (application date where there is none).

075150
144
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20138
201410
201513
201614
20172
20182
201926
202022
202165
2022144
202370
202412
202519
2026 (YTD)59

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical394
  • Solar153
  • Battery storage42
  • Roofing28
  • Electric meters10
  • Plumbing9
  • EV chargers7
  • Accessory dwelling units2
  • Additions2
  • Water heaters1

Permit types

As the building departments classify them.

  • Electrical366
  • Residential19
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM13
  • Solar Panel10
  • Plumbing8
  • BL, CH, EL6
  • Residential Electrical4
  • Solar Panel - Residential & PC4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 17, 2026—INSTALL (N) ROOF MOUNTED PVS 9.68KW, (22) PANELS, AND 27.0KWH ENERGY STORAGE SYS FOR MAIN HOUSEGarden Grove City$34,000
Sep 9, 2026—INSTALL (N) ROOF MOUNTED PVS 4.60KW, (10) PANELS, AND 13.5KWH ENERGY STORAGE SYS FOR ADUGarden Grove City$16,000
Sep 8, 2026PHOTOVALTIC RESIDENTIAL19 PAN 8.74KW PV SYS ESSDavis City$30,000
Aug 13, 2026ELECTRICAL(1) GATEWAY CONTROLLER PANEL (...Los Altos Hills Town$2,000
Aug 3, 2026EInstallation of a 50A EV ChargerContra Costa County$2,000
Aug 3, 2026—INSTALL (N) ROOF MOUNTED PVS 5.52KW, (12) PANELS, AND 10.0KWH ENERGY STORAGE SYS FOR MAIN HOUSEGarden Grove City$28,000
Jul 17, 2026SFD SOLAR PV - ENERGY STORAGE SYSTEMInstallation of a 3.22 kW Roof-Mounted Solar PV SystemOceanside City—
Jun 29, 2026PVRInstallation of a 4.30 kW Roof-Mounted Solar PV System consisting of (10) Modules, (10) Micro-Inverters, (1) 125A Combiner Box, (1) 11.5 kW Tesla Powerwall ESS,Contra Costa County$32,000

Permit status

Where its permits stand, as the departments report them.

  • Not stated339
  • Finaled67
  • Completed26
  • Active19
  • Issued10
  • Additional information required5
  • Reviews in progress4
  • Closed1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • AMECO SOLAR INC
  • AMECO SOLAR

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.