Contractor · Specialty (solar, fire, telecom)
Michael Whitson
44 building permits since 2023 in Greene County, NC; Reidsville city, NC and Davie County, NC, across 6 counties — $655,652 in reported job value over 21 permits that state one.
- Building permits
- 44
- Reported job value
- $655.7K
- Active
- 2023–2026
- Latest permit
- Aug 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greene County, NC10
- Reidsville city, NC9
- Davie County, NC8
- Lenoir County, NC7
- Warren County, NC6
- Roanoke Rapids city, NC4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 7 |
| 2024 | 23 |
| 2025 | 7 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar40
- Electrical16
- Battery storage15
- Remodels3
- Gas1
- Generators1
- New construction1
Permit types
As the building departments classify them.
- Building - Solar Panels7
- Electrical Permit5
- Electrical Permit Application5
- *Residential Solar Installation Permit5
- Solar Installation Permit5
- Electric Permit Application4
- Residential Building Permit4
- Residential Building Permit Application3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 25, 2026 | *Residential Solar Installation Permit | Adding 4 new modules to the existing 8 modules, totaling 12 modules being roof mounted to the existing home and flush mount, and a 18kW Generac Generator with p | Davie County | $26,000 |
| Jul 7, 2026 | *Residential Solar Installation Permit | Adding to Existing system: 4 modules 1.620KW/DC, 4 Solaredge Optimizers and 1-10KWH Energy bank | Davie County | $23,271 |
| Jul 5, 2026 | *Residential Solar Installation Permit | 4 roof mounted solar photovoltaic modules with a battery | Davie County | $23,927 |
| May 27, 2026 | *Residential Solar Installation Permit | 4 roof mounted solar photovoltaic modules to the existing solar . | Davie County | $9,159 |
| Mar 27, 2026 | *Residential Solar Installation Permit | Installation 14 roof mounted solar photovoltaic modules on existing residence. | Davie County | $27,787 |
| Feb 16, 2026 | Electrical | Residential Installation of (1) 10kWh Solaredge Energy Bank Battery to an Existing 10 module Roof Mounted Photovoltaic System | Reidsville City | — |
| Feb 11, 2026 | Electrical | Residential Installation of (1) 10kWh Solaredge Energy Bank Battery to an Existing 13 module Roof Mounted Photovoltaic System | Reidsville City | — |
| May 13, 2025 | Building - Solar Panels | Roof Mounted PV | Reidsville City | — |
Permit status
Where its permits stand, as the departments report them.
- Active20
- Completed17
- Stop work ordered6
- Closed1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.