Contractor · Specialty (solar, fire, telecom)

Kristin Beringer

44 building permits since 2021 in Fitchburg city, MA; Marlborough city, MA and Haverhill city, MA, across 3 counties.

Building permits
44
Reported job value
—
Active
2021–2026
Latest permit
Oct 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fitchburg city, MA40
  • Marlborough city, MA2
  • Haverhill city, MA1
  • Webster town, MA1

Permits by year

By issue date (application date where there is none).

01530
26
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
202126
20224
20232
20242
20256
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers44
  • Plumbing5
  • Roofing2
  • Kitchens1
  • Remodels1
  • Electrical1

Permit types

As the building departments classify them.

  • Sprinkler System Permit40
  • Fire Sprinkler System Permit to Modify (minor not to exceed 6 heads), Repair, Maintain, Remove Fire Sprinkler Systems and or Com2
  • Application for Sprinkler Install or Modification1
  • Sprinkler System Install/Repair1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 15, 2026Fire Sprinkler System Permit to Modify (minor not to exceed 6 heads), Repair, Maintain, Remove Fire Sprinkler Systems and or Com—Marlborough City—
Oct 15, 2026Fire Sprinkler System Permit to Modify (minor not to exceed 6 heads), Repair, Maintain, Remove Fire Sprinkler Systems and or Com—Marlborough City—
Aug 11, 2026Sprinkler System Permit***TEMPORARY SHUTDOWN*** Shut down less than 8 hours for work to replace one 21’-0” section of 4” dry pipe main at roof deck that is leaking and has been patcheFitchburg City—
Mar 13, 2026Sprinkler System PermitRepair leak previously patched.Fitchburg City—
Oct 3, 2025Sprinkler System PermitRepair leak in Building 2Fitchburg City—
Aug 28, 2025Sprinkler System PermitTemporary shutdown less than 8 hours. No modifications. Work to repair and re-test 4" back flow preventer on fire sprinkler main.Fitchburg City—
Aug 28, 2025Sprinkler System Permit5 year testing and replace leaking floor control stations on 1st, 3rd, and 5th floorFitchburg City—
May 16, 2025Sprinkler System Permitflush and service all backflows and retestFitchburg City—

Permit status

Where its permits stand, as the departments report them.

  • Completed42
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.