Contractor · Electrical

Benjamin Kempf

44 building permits since 2018 in Warwick city, RI; Cumberland town, RI and Cranston city, RI, across 4 counties — $112,600 in reported job value over 42 permits that state one.

Building permits
44
Reported job value
$112.6K
Active
2018–2026
Latest permit
May 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Warwick city, RI10
  • Cumberland town, RI9
  • Cranston city, RI7
  • Providence city, RI7
  • Coventry town, RI2
  • Lincoln town, RI2
  • North Providence town, RI2
  • Bristol town, RI1
  • East Greenwich town, RI1
  • Smithfield town, RI1

Permits by year

By issue date (application date where there is none).

0510
9
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20189
20198
20203
20218
20228
20232
20243
20252
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical44
  • Electric meters8
  • Pools & hot tubs8
  • Additions4
  • HVAC3
  • Bathrooms3
  • Kitchens1
  • Remodels1
  • Windows & doors1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical Permit36
  • 2) Electrical Permit7
  • EG Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 27, 2026Electrical Permit—Narragansett Town—
Jul 14, 2025Electrical PermitInstall GFCI protected Pool Receptacle and bonding ring for above ground pool.Warwick City$1,100
May 23, 2025Electrical Permitupgrade existing service to 200ACumberland Town$3,900
Jun 19, 2024Electrical PermitWiring and bonding for above ground pool. Install 20A twist lock receptacle circuit. Install 20A service gfci circuit. Bond motor, water filter, and ground loopCoventry Town$1,500
Apr 24, 2024Electrical Permitupgrade service from 100A to 200AWarwick City$4,000
Mar 27, 2024Electrical PermitReplace damaged meter socket. Like equipment for like equipment. Photos attached. Per RI Energy "We noticed that there are outage notes from 3/21/24 on 15 NEW EWarwick City$800
Jul 7, 2023EG Electrical PermitExisting meter for second story 100A service to be removed. Main panel to be converted to 100A sub panel fed from existing 200A service,East Greenwich Town$2,800
Apr 17, 2023Electrical PermitAll existing Knob and Tube Conductors to be removed from structure. Household circuits to be rewired with NM Conductors. Lighting and receptacles to be added asProvidence City$22,000

Permit status

Where its permits stand, as the departments report them.

  • Completed30
  • Active14

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.